Similar Projects
Plaza at Pinnacle Hills NW
New Construction, Infrastructure - 15,360 SF
Conception
$3,300,000 est. value
Rogers, AR 72758

8th Street Commercial Buildings
New Construction, Infrastructure
Conception
$5,800,000 CJ est. value
Rogers, AR 72758

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Four Bay T-Hangar
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Midway, AR 72651

Arkansas State University - Mountain Home - Technical Center Expansion / Aplus
Addition, Demolition, Infrastructure
Bidding
$80,000 CJ est. value
Mountain Home, AR 72653

Construction of AWIN Tower Site Work Designs
Infrastructure
Post-Bid
Little Flock, AR

Repairs and Improvements to the Jacob Wolf House Historic Site
Infrastructure
Post-Bid
Norfork, AR 72658

New Walking / Biking Trail on the Campus of ASU-MTN
Results
Mountain Home, AR

Co. Rd. 806 Surfacing
Results
AR

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

SW 4th and B Street Townhomes
New Construction, Infrastructure - 10,451 SF
Construction
$2,000,000 CJ est. value
Bentonville, AR 72712

Morning Star Subdivision
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Bentonville, AR 72712

Jiffy Trip #721 / Rogers
New Construction, Infrastructure
Pending Verification
$1,430,000 CJ est. value
Rogers, AR 72756

Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Design
$12,100,000 CJ est. value
Rogers, AR 72758

Last Updated 11/18/2022 07:34 AM
Project Title

Snow Lake - Elaine (S)

Physical Address View project details and contacts
City, State (County) Crumrod, AR 72328   (Phillips County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $8,451,733 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Purpose of This Project Is to Level With Achm Surface Course and Apply an Asphalt Surface Treatment on Approximately 24.133 Miles of Highway 44 in Desha and Phillips Counties. This Project Consists of Fog Seal, Asphalt Surface Treatment, Achm Surface Course, Maintenance of Traffic, Geotextile Fabric, Rumble Strips, Pavement Marking, and Misc. Items. Routes : 44 Sections: 2 & 3 County : Desha & Phillips Length : 24.133 miles in length. The Successful Bidder Will Be Required to Complete This Contract Within Twenty (25) Working Days. Questions Pertaining to Projects During the Advertisement Period Should Be Addressed to the Program Management Division at Pmd@ardot.gov. the Deadline to Submit a Question Is the Wednesday Prior to the Scheduled Letting Date. a Question Submitted After the Close of Business on the Wednesday Prior to the Scheduled Letting Date May Not Receive a Response. In Order to Have a Bid Considered, Contractors Must Furnish a Proposal Guaranty Consisting of Either a Bidder's Bond or a Certified or Cashier's Check in the Amount of Five Percent (5%) of the Total Amount Bid. in Order for a Bond to Be Acceptable to the Department, the Company Issuing the Bond Must Be Named in the Department of Treasury Listing of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies. the Underwriting Limitation of the Bonding Company Shall Be Adhered to. Any Excess (Between the Face Amount of the Bond and the Underwriting Limitation) Shall Be Protected by Reinsurance Provided by an Acceptable Reinsuring Company. These Contracts Are Subject to Normal Prequalification, Licensing and Bonding Requirements, Applicable Labor Laws, Non-discrimination Provisions, Wage Rate Laws and Other Federal Laws Including the Fair Labor Standards Acts of 1938. the Work Hours Act of 1962 and Title Vi of the Civil Rights Act of 1964 Also Apply. The Arkansas Department of Transportation Complies With All Civil Rights Provisions of Federal Statutes and Related Authorities That Prohibited Discrimination in Programs and Activities Receiving Federal Financialassistance. Therefore, the Department Does Not Discriminate on the Basis of Race, Sex, Color, Age, National Origin, Religion, or Disability, in the Admission, Access to and Treatment in Department's Programs and Activities, as Well as the Department's Hiring or Employment Practices. Complaints of Alleged Discrimination and Inquiries Regarding the Department's Nondiscrimination Policies May Be Directed to Joanna P. Mcfadden, Section Head - Eeo/dbe (Ada/504/title Vi Coordinator), P. O. Box 2261, Little Rock, Ar 72203, (501) 569-2298, (Voice/tty 711), or the Following Email Address: Joanna.mcfadden@ardot.gov. The Department Reserves the Right to Reject Any or All Bids and to Waive Any Formalities. ARDOT - Snow Lake - Elaine (S)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents