Similar Projects
Detention Ponds Improvement Project
Post-Bid
Golden, CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Las Vegas Street Culvert at Colony Hills Channel
Results
Less than $1,000,000 est. value
Colorado Springs, CO 80903

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Marion Street System, Phase 1
Results
$6,500,000 to $7,200,000 est. value
Denver, CO

Detention Pond Improvements
Post-Bid
Golden, CO

Savanna 5th Subdivision Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value
Loveland, CO 80537

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Centennial Center Park Drainage Construction
Results
Centennial, CO 80112

As Needed Culverts 2020
Post-Bid
Glenwood Springs, CO 81601

Cottonwood Creek Stormwater Detention Basin Pr-2
Results
Less than $4,000,000 est. value
Colorado Springs, CO

Ponderosa Community Stabilization Project
Post-Bid
Boulder, CO

Last Updated 05/05/2021 10:12 AM
Project Title

112th and Irma Drive Drainage Improvements

Physical Address View project details and contacts
City, State (County) Northglenn, CO 80233   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids for drainage improvements at 112th and Irma Drive. This work will include installing type R inlet, storm sewer manhole, 24" class 3 RCP pipes, vertical curb and gutter to improve drainage at 112th and Irma.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents