Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

Gaoa - Salmon River Road Corridor Rec. Site Maintenance (Surface Rock) 4Cn
Term Contract
Design
$100,000 to $250,000 est. value
ID

Constructing Intersection Improvements with Signal Improvements, Additional Left-Turn Lane and a Dedicated Right-Turn Lane
Infrastructure
Bidding
ID

US-26 / SH-39, FY22 W Pavement Preservation
Infrastructure
Bidding
ID

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Road Improvement Project on the Sawtooth National Forest
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Stanley, ID 83278

Asphalt for Chip Seal Operation
Infrastructure
Bidding
Moscow, ID

Kathleen Avenue Improvements
Infrastructure
Post-Bid
Coeur d'Alene, ID 83815

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Asphalt Projects 2022
Infrastructure
Bidding
Sagle, ID 83860

For the Work of Performing Preventative Pavement Maintenance on All State Roads in Power County
Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value
ID

Widening SH-3 and conducting levee repair between MP 91.86 and MP 89.26
Infrastructure
Results
ID

Last Updated 03/14/2022 03:19 AM
Project Title

Street Overlays 2022

Physical Address View project details and contacts
City, State (County) Idaho Falls, ID   (Bonneville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $641,580
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the Contractor furnishing all tools, labor, equipment, and materials necessary to replace approximately 270 LF of curb & gutter and 125 SY of concrete sidewalk, install 5,200 tons of asphalt plant mix pavement, adjust approximately 7 manhole rings and 12 water valve boxes, and any additional items

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents