Similar Projects
Gates District at Broadway Station
New Construction, Infrastructure - 965,000 SF
Design
$150,000,000 CJ est. value
Denver, CO 80223

Colfax Avenue Apartments
Demolition, New Construction, Infrastructure - 6,210 SF
Design
$50,000,000 CJ est. value
Denver, CO 80218

Marston Lake North Upstream of Glenbrook Pond, Phase 1
Infrastructure
Bidding
$2,850,000 CJ est. value
Denver, CO 80202

Marston Lake North Upstream of Glenbrook Pond, Phase 1
Infrastructure
Bidding
$2,850,000 CJ est. value
Denver, CO 80202

SRTS - McAuliffe International School
Infrastructure
Sub-Bidding
$1,300,000 CJ est. value
Denver, CO 80207

SRTS - McAuliffe International School
Infrastructure
Sub-Bidding
$1,300,000 CJ est. value
Denver, CO 80207

Habitat For Humanity
Post-Bid
Denver, CO 80014

Tower Farms
Post-Bid
CO

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

Design-Build Services for the 56th Avenue Widening Project - Peoria Street to Pena Boulevard
Results
Denver, CO 80238

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

Block 176
New Construction, Demolition - 767,123 SF
Construction
Denver, CO 80202

35th Avenue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Denver, CO 80207

Lincoln Street Office Development
New Construction, Infrastructure - 21,894 SF
Pending Verification
$5,000,000 CJ est. value
Denver, CO 80203

231 Detroit Street - Residential Multifamily
Demolition, New Construction, Infrastructure - 11,000 SF
Design
$50,000,000 CJ est. value
Denver, CO 80206

Last Updated 08/08/2022 05:05 PM
Project Title

Mill Levy 15A - Traffic Signals Construction

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,464,210 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is the 2022 Traffic Signal Upgrade Mill Levy Package #15A. The overall objective of this project is reconstruction of the traffic signals and intersections of one major corridor within the City and County of Denver 8th Avenue. There are a total of ten (10) traffic signals in this project and the locations of these traffic signal upgrades are at the following intersections: 1. 8th & Grant, 2. 8th & Logan, 3. 8th & Washington, 4. 8th & Clarkson, 5. 8th & Corona, 6. 8th & Downing, 7. 8th & Williams/High [MB], 8. 8th & York, 9. 8th & Josephine, 10. 8th & Clayton/Detroit [MB]. In addition to the traffic signal upgrades, there will be improvements made to curb ramps, sidewalk, curb and gutters, curb returns, and damaged sidewalks, and curb and gutter at each intersection for enhanced pedestrian access. Ramp improvements will be constructed to current CCD standards and specifications. In addition, there are existing storm sewer inlets and manholes at the intersections requiring relocation or resetting. Estimated Construction Cost: Between $2,250,000.00 and $2,700,000.00 Prequalification Requirements: 1D(1) Traffic Signals, Lighting and ITS at or above the $3,000,000.00 monetary level. MWBE Participation: 17% Prevailing Wage and Minimum Wage: Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C. As the Citys best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents