Similar Projects
US-20, US-26, Chinden Blvd; I-84 to Middleton Rd
Infrastructure
Bidding
$25,000,000 est. value
Caldwell, ID

USFS Region One Timber Stand Improvement and Hand Fuels Treatments
Alteration
Post-Bid

Annual Irrigation Replacement FY22
Term Contract
Post-Bid
Nampa, ID

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Moscow North and Moscow Alt Route
Infrastructure
Results

Lawn and Landscaping Services at State Hospital West
Term Contract
Post-Bid
Nampa, ID

Nampa Dog Park 2
Infrastructure
Results
Nampa, ID 83686

2022, Ustick Road Widening, Ashton Avenue to I-84
Infrastructure
Post-Bid
$260,000 est. value
Caldwell, ID 83607

Cold Milling, HMA Paving, and a Silica Fume Bridge overlay on SH-45
New Construction, Infrastructure
Results
ID

Landscape, Grounds Maintenance and Snow Removal
Infrastructure, Alteration
Post-Bid
Nampa, ID

Region 4 Intermountain Region USFS Tree Planting IDIQ
Term Contract
Results
$100,000 to $250,000 est. value

Ustick Road and Santa Ana Avenue Roundabout
Infrastructure
Post-Bid
$950,000 est. value
Nampa, ID 83687

Intersection SH 47 Improvements, Ashton
Infrastructure
Results
$5,000,000 to $10,000,000 est. value

N Midland Boulevard and W Karcher Road Widening and Guardrail Repair
Infrastructure
Results
Nampa, ID

Midland Boulevard and Lake Lowell Intersection
Infrastructure
Results
Nampa, ID

Reported 05/18/2022 12:00 AM
Project Title

Kings Road and Victory Road Roundabout

Physical Address View project details and contacts
City, State (County) Nampa, ID 83687   (Canyon County)
Category(s) Heavy and Highway, Outdoor Lighting, Single Trades
Sub-Category(s) Exterior Lighting, Landscaping/Irrigation, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022, Construction Completion Expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

installation of a new single lane roundabout at the intersection of Kings Road and Victory Road. The roundabout will be shifted about 50 feet southeast of the existing intersection. Work will include new 10 feet wide multi-use paths on the north side of Victory Road and the east side of Kings Road. Work will widen Victory Road about 1000 feet to the west to include three lanes and sidewalks on both sides. The project will also include center island landscaping, lighting, and new water and pressurized irrigation lines.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents