Similar Projects
Boyd H Anderson High School SMART Program
Renovation
Conception
$5,274,000 est. value
Fort Lauderdale, FL 33309

Cooper City High School STEM Lab Improvements
Renovation
Conception
$8,459,000 est. value
Fort Lauderdale, FL 33328

School Board of Broward County's Perry Middle School Property
Design
Miramar, FL 33025

Academic Solutions Academy Charter High School
Renovation, Addition - 22,830 SF
Design
Coral Springs, FL 33065

Westglades Middle School - Smart Program Renovations
Renovation
Bidding
$1,905,553 est. value
Parkland, FL 33076

Aquatics Facility Renovations - Deerfield Beach Middle School
Renovation, Infrastructure
Bidding
$1,425,000 est. value
Deerfield Beach, FL 33441

William East Dandy Middle School-Smart Program Renovations
Renovation
Post-Bid
Less than $2,101,196 est. value
Fort Lauderdale, FL 33311

J. P. Taravella High School Smart Program Renovations Project
Renovation
Post-Bid
Coral Springs, FL 33313

New River Middle School - Smart Program Renovations
Renovation
Results
Fort Lauderdale, FL 33024

Wingate Oaks Center - Smart Program Renovations
Renovation
Results
Less than $1,706,457 est. value
Fort Lauderdale, FL 33311

Alazhar School
Addition - 19,785 SF
Construction
$1,711,950 est. value
Tamarac, FL 33068

Piper High School - Smart Program Renovations
Renovation, Term Contract
Construction
Sunrise, FL 33351

Deerfield Beach HS SMART Program
Conception
$2,902,214 est. value
Deerfield Beach, FL 33441

Mesivta of Coral Springs
Renovation - 40,712 SF
Design
Coral Springs, FL 33065

Charter Schools Entry Modifications
Renovation
Post-Bid
$950,000 est. value
Pembroke Pines, FL 33027

Last Updated 07/21/2021 01:45 AM
Project Title

Pre-Construction and Construction Manager at Risk Services for The Historic Miramar Innovation and Technology Village - Perry Middle School Property

Physical Address View project details and contacts
City, State (County) Miramar, FL 33023   (Broward County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager to provide professional Pre-Construction and Construction Manager at Risk Services for the Historic Miramar Innovation and Technology Village - Perry Middle School Property (“Project”), as part of its Capital Improvement Program. The proposed Scope of Work is as following: (Misc Site Clearing and Site Work; Site Lighting; Site Fencing; Restroom and Storage Building; Tennis Courts; Table Tennis; Open Play Field Area; Running Track; Concrete Sidewalks; Landscape and Irrigation; Resurfacing of Existing Basketball Courts; Playground and Exercise Equipment).

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents