Similar Projects
Brownsville Transit Village - Phase V
New Construction - 99,854 SF
Conception
$26,711,893 est. value
Miami, FL 33142

San Sebastian Inland Harbor
New Construction - 50,118 SF
Conception
$80,000,000 est. value
Saint Augustine, FL

Bay Harbour Marina Village
New Construction - 30,000 SF
Design
$10,000,000 CJ est. value
Fort Myers Beach, FL 33931

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

The Reserve at Jensen Beach
New Construction
Sub-Bidding
$21,250,000 est. value
Jensen Beach, FL 34957

Hallandale Oasis
New Construction, Build-Out - 93,910 SF
Sub-Bidding
$370,000,000 est. value
Hallandale, FL 33009

Orange Avenue Apartments
New Construction, Demolition
Post-Bid
$11,000,000 est. value
Tallahassee, FL

Hilltop Apartments
Renovation
Post-Bid
Madison, FL 32340

Esplanade On Palmer Ranch
New Construction
Construction
$10,000,000 CJ est. value
Sarasota, FL 34240

Hollywood East
New Construction, Build-Out
Construction
$48,650,000 est. value
Hollywood, FL 33020

Varadero
New Construction - 2,456,798 SF
Conception
$10,000,000 CJ est. value
Sunny Isles, FL

Atlantic 3350
New Construction - 647,925 SF
Design
$85,000,000 est. value
Pompano Beach, FL 33062

Via Mizner
New Construction - 730,000 SF
Construction
$63,651,007 est. value
Boca Raton, FL 33432

Auburn Village - Winter Haven
New Construction
Conception
Auburndale, FL 33823

Resorts World Miami
New Construction, Renovation
Design
Miami, FL 33132

Last Updated 04/29/2020 08:21 AM
Project Title

Key West International Airport Noise Insulation Program Construction of KWBTS(Key West By The Sea) Building A - Phase 1

Physical Address View project details and contacts
City, State (County) FL   (Monroe County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of building construction and replacement work necessary to improve the noise insulation of condominium units in Building A of the Key West by the Sea Condominium (KWBTS) in Key West, Florida. This Bid Package describes and specifies work which may include window replacement, exterior prime door replacement; sliding glass patio door replacement, removal and infill of “through-wall” portable air conditioning units, addition of ductless AC system, addition of Energy Recovery Ventilator (ERV) unit and all work related to the installation of the ductless air conditioners and ERV to include electrical panel modifications, cutting and repair of gypsum ceilings, construction of wall pilasters to house required ducts and lines and required finishing work to include stucco repair and painting. Given the presence of asbestos in the existing caulking, stucco, gypsum board and ceiling, the KWBTS work will also require asbestos abatement at all surfaces disturbed to include window/door openings, wall infilling, walls and ceilings.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Acoustic Insulation, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 44 - Pollution and Waste Control Equipment, Noise Pollution Control Equipment, Fixed Noise Abatement Barriers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents