Similar Projects
US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 2 - Arizona Department of Transportation (AZDOT)
Alteration
Conception
$41,000,000 est. value
Kingman, AZ 86401

Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1
Infrastructure
Design
$5,655,000 est. value
Kingman, AZ

I-11 Rancho Santa Fe TI - City Of Kingman
Infrastructure
Design
$48,817,815 est. value
Kingman, AZ

Laughlin/Bullhead International Airport - Replace Apron Security Lighting Project
Infrastructure
Bidding
$600,000 CJ est. value
Bullhead City, AZ 86429

Laughlin/Bullhead International Airport - Replace Apron Security Lighting Project
Infrastructure
Bidding
$600,000 CJ est. value
Bullhead City, AZ 86429

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Box Canyon Excavating of 3 House Pads
Infrastructure
Post-Bid
Peach Springs, AZ

Safety Improvements
Results
Less than $640,000 est. value
Kingman, AZ 86411

Apache Road Improvements North Phase
Results
Kingman, AZ 86413

Trails at Black Mountain
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Bullhead City, AZ 86442

Eastern Street Improvements - Airway To Calumet - City Of Kingman
Alteration
Conception
$3,695,400 est. value
Kingman, AZ 86401

Design-Build Services for Aluminum Dross Remediation at the Kingman Municipal Airport
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Kingman, AZ 86401

Centennial Park Exploration Drilling Project
Infrastructure
Bidding
$650,000 CJ est. value
Kingman, AZ 86409

City-Wide Paving Project
Infrastructure
Post-Bid
Bullhead City, AZ 86442

Last Updated 08/04/2022 11:38 AM
Project Title

Nucor Melt Shop Facility

Physical Address View project details and contacts
City, State (County) Kingman, AZ 86401   (Mohave County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a manufacturing facility. As of August 4, 2022, this project is in planning. No permits have been issued. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents