Similar Projects
HOVE Maint VC Fire Suppression System
Bidding
Montezuma Creek, UT 84532

Fire Alarm System Inspections
Bidding
Huntington, UT

Fire Suppression System
Post-Bid
Ogden, UT 84401

La Verkin Elementary School Fire Sprinklers
Post-Bid
La Verkin, UT 84745

Z--Replace Fire Suppression Pump System at Fish Spring
Results
$25,000 to $100,000 est. value
Ibapah, UT

GLCA Fire Extinguisher Service
Results
UT

Fire Alarm Replacement
Post-Bid
Nephi, UT 84648

DFCM Construction - State Hospital Rampton 2 and Forensics Fire Alarm Upgrades
Results
$300,000 est. value
Provo, UT 84606

Replace Fire Suppression System at Fish Springs National Wildlife Refuge, UT
Post-Bid
$25,000 to $100,000 est. value
Ibapah, UT

Bountiful High School Fire Alarm Upgrade
Results
$250,000 to $450,000 est. value
Bountiful, UT 84010

Pioneer Museum Fire Alarm Upgrade
Post-Bid
Salt Lake City, UT

SLCC TRC TB Corridor Ceiling and Fire Sprinkler Upgrade
Results
$990,000 est. value
Salt Lake City, UT 84123

GTI Annex, Fire Sprinkler Project
Post-Bid
Salt Lake City, UT 84115

DFCM Construction-UNG Camp Williams Deluge System
Results
$207,000 est. value
Bluffdale, UT 84065

Construction: Westbrook Elementary, Fire Alarm Upgrade
Results
Less than $100,000 est. value
Taylorsville, UT 84129

Last Updated 03/29/2021 07:41 AM
Project Title

Alpine School District Fire Alarm Testing and Inspection

Physical Address View project details and contacts
City, State (County) American Fork, UT   (Utah County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide Alpine School District with Fire Alarm System Testing and Inspection as prescribed by NFPA. Scope of Work: Code Conformance – System testing and documentation shall be performed as prescribed by current published NFPA standards and the requirements of the local authority having jurisdiction. Total System Test Report – Components of the system area shall be tested for proper operation and documented in the service reports as the testing is completed and sent to all municipalities, fire marshall, and/or any governing bodies requiring a copy of the annual test report. Copy shall be also forwarded to each school site, and the Electrical Leadman.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents