Similar Projects
Last Updated | 08/30/2022 04:07 PM |
Project Title | Sonntag Avenue, Golfmoor to Maryland Water Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Evansville, IN 47712 (Vanderburgh County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Final questions to be submitted by August 23, 2022 to Bill Lewis – blewis@threeidesign.com and copy EWSU Project Manager, Ryan Mayer – rjmayer@ewsu.com. A water main replacement project along Sonntag Avenue, from Maryland Street, north to Golfmoor Road. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing, and all appurtenances necessary to complete the work shown in the Drawings and the Specifications. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary to complete the work shown in the Drawings and Specifications. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications. The above referenced project description includes items that are part of the Itemized Base Bid. The Contractor shall be responsible for all work shown on the plans and described in the specifications pertaining to the Itemized Base Bid, regardless of the installation method chosen. The Evansville Water and Sewer Utility further reserves the right to waive informalities, and to award the contract to the lowest and most responsible bidder (or bidders), all to the advantage of the Evansville Water and Sewer Utility, or to reject all Proposals. The purpose of this project is to replace an existing main along Sonntag Avenue from Maryland Street to Golfmoor Road This project will replace approximately 1,200 feet of existing water main. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |