Similar Projects
St Paul's Church Storage Building / Evansville
New Construction, Infrastructure - 1,500 SF
Design
$160,000 CJ est. value
Evansville, IN 47720

Pavement and Bridge Replacement
Infrastructure
Bidding
$5,828,758 CJ est. value
Evansville, IN 47720

Pavement and Bridge Replacement
Infrastructure
Bidding
$5,828,758 CJ est. value
Evansville, IN 47720

Roadway Improvements
Post-Bid
Darmstadt, IN

2021 Community Crossings
Post-Bid
Evansville, IN

Fendrich Neighborhood Watermain Replacement
Results
Less than $1,970,000 est. value
Evansville, IN 47711

Abandoned Coal Mine Restoration
Results
$150,000 est. value

North Cullen Avenue / Retail
New Construction, Infrastructure
Pending Verification
$700,000 CJ est. value
Evansville, IN 47715

Liberty Federal Credit Union / Evansville
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Evansville, IN 47712

Green River Road Trail Project, Phase 2
Infrastructure
Bidding
$2,000,000 CJ est. value
Evansville, IN 47715

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Milling and Resurfacing of County Roads
Results
Evansville, IN

Saint Joseph Industrial Park Drive / Warehouse Addition
Addition, Demolition, Infrastructure
Pending Verification
$500,000 CJ est. value
Evansville, IN 47720

Tupman Road Water Main Replacement
Infrastructure
Bidding
$554,700 CJ est. value
Evansville, IN 47720

Green River Road Trail Project
Infrastructure
Post-Bid
$40,000 est. value
Evansville, IN 47725

Last Updated 08/30/2022 04:07 PM
Project Title

Sonntag Avenue, Golfmoor to Maryland Water Main Replacement

Physical Address View project details and contacts
City, State (County) Evansville, IN 47712   (Vanderburgh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Final questions to be submitted by August 23, 2022 to Bill Lewis – blewis@threeidesign.com and copy EWSU Project Manager, Ryan Mayer – rjmayer@ewsu.com. A water main replacement project along Sonntag Avenue, from Maryland Street, north to Golfmoor Road. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing, and all appurtenances necessary to complete the work shown in the Drawings and the Specifications. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary to complete the work shown in the Drawings and Specifications. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications. The above referenced project description includes items that are part of the Itemized Base Bid. The Contractor shall be responsible for all work shown on the plans and described in the specifications pertaining to the Itemized Base Bid, regardless of the installation method chosen. The Evansville Water and Sewer Utility further reserves the right to waive informalities, and to award the contract to the lowest and most responsible bidder (or bidders), all to the advantage of the Evansville Water and Sewer Utility, or to reject all Proposals. The purpose of this project is to replace an existing main along Sonntag Avenue from Maryland Street to Golfmoor Road This project will replace approximately 1,200 feet of existing water main.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents