Similar Projects
Flood Protection System Project
Infrastructure
Bidding
$11,750,000 CJ est. value
Clarksville, MO 63336

Carriage Oaks Pump Station
Infrastructure
Bidding
$800,000 CJ est. value
Blue Springs, MO 64015

Plumbing Fixtures
Term Contract
Sub-Bidding
Columbia, MO 65203

Professional Plumbing Services
Alteration
Post-Bid
Country Club Hills, MO 63136

On Call and Emergency Maintenance Services for Plumbing
Term Contract
Post-Bid
Raytown, MO

Mechanical/Plumbing /HVAC Insulation Services
Alteration
Results
Columbia, MO

District Wide Drinking Fountain/Bottle Filler Installation
Alteration
Results
Hazelwood, MO

Plumbing
Renovation
Construction
$16,000 CJ est. value
Saint Charles, MO 63301

Peruque Lift Station Concrete Lining and Dump Station
Infrastructure, Renovation
Bidding
$767,000 CJ est. value
Cottleville, MO 63366

Rex Park Restroom Plumbing
Alteration
Post-Bid
Breckenridge Hills, MO 63114

McCracken Road Dam Rehabilitation
Infrastructure
Results
$2,000,000 CJ est. value
Ozark, MO 65721

Fabick Pump Station (P-444) Improvements (SKME-404E)
Renovation, Infrastructure
Bidding
$700,000 CJ est. value
Fenton, MO 63026

Plumbing On-Call Services
Term Contract
Post-Bid
Crestwood, MO

Installation of Flow Meter
Infrastructure
Results
$126,365 CJ est. value
Saint Louis, MO 63103

Plumbing Services for the Philips Park Pavilion
Term Contract
Post-Bid
Columbia, MO 65201

Last Updated 01/21/2023 07:33 AM
Project Title

Wastewater System Improvements

Physical Address View project details and contacts
City, State (County) Granby, MO 64844   (Newton County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,430,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Project Scope: At the treatment plant, provision of a 1.955 gallon peak flow detention tank including earthwork, foundations, duplex 175 gpm sewage return pumps and pipework, provision of an aeration system with duplex 300 cfm blowers, diffusers, pipework, and support platform at existing sludge tank, construction of duplex 6 ft. x 38 ft. rectangular clarifiers with sludge scraper mechanism, walkway, effluent weirs, scum pump, duplex 150 gpm sludge pumps and pipework, aeration basin-to-clarifiers mixed liquor gravity flow pipework, removal and replacement of ultraviolet disinfection system in existing channels, a new 250 KW generator, plus electrical work and equipment, fence work, miscellaneous pipework, sitework, and stormwater pollution prevention plan implementation. At the collection system primary lift station, construction of a junction manhole, a vertical mechanical trash screen and manhole, a new 10 ft. diameter wet well, duplex 192 gpm submersible sewage pumps, repositioning existing submersible sewage pumps into new wet well, valve vault and pipework, electrical work and equipment, fence work and sitework, plus, construction of 2600 ft. (+/-) of 6-inch C-900 PVC pressure sewer, include two steel pipe casing borings, from the lift station to a new valved interconnect with an existing 8-inch PVC pressure sewer near the treatment plant, including valve vault and pressure sewer pipes and connections to the peak flow detention tank.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents