Similar Projects
Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Raw Water Transmission Main Upgrades - Phase 1 Pipe Bridge
Infrastructure
Bidding
Utica, NY

Improvements to the Water Feature Circulation System at Sonnenberg Gardens and Mansion State Historic Park
Infrastructure
Bidding
$211,400 to $286,000 est. value
Canandaigua, NY 14424

2021 Water Maintenance Materials
Term Contract
Post-Bid
Peekskill, NY 10566

Water District No. 2 - Phase 7
Post-Bid
Lake Placid, NY 12946

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

Installation of Cone Valves at East Delaware Tunnel Outlet
Results
$721,650 to $976,350 est. value
Neversink, NY 12765

Water Meters
Term Contract
Bidding
Huntington, NY

Energy Recovery Facility Condensate Pipeline Replacement
Post-Bid
Syracuse, NY 13202

Water District No. 13 Water Main Installation
Results
Clarendon, NY 14429

Requirements Contract for the Maintenance and Replacement of Flow Control Valves
Infrastructure
Bidding
Syosset, NY

Domestic Water Upgrades
Post-Bid
Troy, NY

Water System Improvements - Town of Hamburg and West Seneca, City of Lackawanna
Results
Hamburg, Lackawanna, West Seneca, NY

Underground Utility Repair Services
Infrastructure
Bidding
Lewiston, NY 14092

Ductile Cement Lined Pipe and Gaskets
Term Contract
Post-Bid
Rochester, NY

Reported 01/21/2022 12:00 AM
Project Title

Excavate, Repair Waterline Break, Backfill and Restore Site

Physical Address View project details and contacts
City, State (County) Staten Island, NY 10305   (Richmond County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value Less than $25,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all labor, material, equipment, transportation, disposal, supervision, and incidental related work necessary to excavate, repair fire hydrant water line, backfill and restore the site at USCG Station New York.

Details

Division 31 - Earthwork, Excavation and Fill, Fill, Backfill.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents