Similar Projects
N-51, US-77 - US-75
Infrastructure
Post-Bid
$5,000,000 to $10,000,000 est. value
NE

Burt County 2022 Overlays
Infrastructure
Post-Bid
$4,657,852 CJ est. value
Craig, NE 68019

Decatur Bridge Maintenance
New Construction, Infrastructure
Results
Less than $5,000,000 est. value
NE

District 3 On-Call Util Location Service 2019 D3 District wide ER Event
Infrastructure
Results
Less than $5,000,000 est. value

County Road 21 - Burt County
Infrastructure
Pending Verification
$800,000 CJ est. value
Craig, NE 68019

County Road 21 - Burt County
Infrastructure
Pending Verification
$800,000 CJ est. value
Craig, NE 68019

Lyons Decatur Northeast Schools Addition - Correction to listing
Addition, Demolition, Infrastructure - 60,000 SF
Post-Bid
$12,000,000 CJ est. value
Lyons, NE 68038

County Road H - Burt County
Infrastructure
Pending Verification
$1,334,000 CJ est. value
Oakland, NE 68045

East of Connealy - Burt County
Infrastructure
Pending Verification
$65,000 CJ est. value
Craig, NE 68019

County Road L - Burt County
Infrastructure
Pending Verification
$250,000 CJ est. value
Oakland, NE 68045

County Road F - Burt County
Infrastructure, Renovation
Pending Verification
$80,000 CJ est. value
Tekamah, NE 68061

County Road M - Burt County
Infrastructure
Pending Verification
$850,000 CJ est. value
Oakland, NE 68045

County Road N - Burt County
Demolition, New Construction, Infrastructure
Pending Verification
$360,000 CJ est. value
Oakland, NE 68045

County Road U - Burt County
Demolition, New Construction, Infrastructure
Pending Verification
$700,000 CJ est. value
Logan, NE 68038

Old Highway 118 / County Roads 15-23 - Burt County
Infrastructure
Pending Verification
$960,000 CJ est. value
Lyons, NE 68038

Last Updated 11/16/2022 12:15 PM
Project Title

County Road 19 - Burt County

Physical Address View project details and contacts
City, State (County) Oakland, NE 68045   (Burt County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

County Road 19 north of J Bridge, bridge replacement. A detailed scope of work has not been identified. As of September 28, 2021, the Burt County Board of Supervisors adopted the 2021-2022 budget. Information regarding an architect, general contractor or method of selection have not been disclosed. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents