Similar Projects
Library Bond Projects
Renovation
Conception
$778,000 est. value
Monroe, NC

New Pender County Library
New Construction - 14,000 SF
Conception
$7,000,000 est. value
Burgaw, NC

Charlotte Mecklenburg Main Library
New Construction - 115,000 SF
Design
$100,000,000 est. value
Charlotte, NC 28202

Grace Library & Museum Building
New Construction
Design
Wilmington, NC 28401

Archives Library Building - Package J - Renovations
Renovation
Post-Bid
Raleigh, NC

North Regional Library Renovation
Renovation
Post-Bid
Raleigh, NC 27615

Engineering Services - Building And Envelope Commissioning
New Construction, Renovation - 287,969 SF
Results
NC

Morrisville Town Center Core - Phase I
New Construction - 277,300 SF
Results
$13,000,000 to $44,400,000 est. value
Morrisville, NC

Jacob Cornsilk Community Complex
New Construction - 46,370 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Robbinsville, NC 28771

Morrisville Town Center Core - Phase 1
New Construction
Pending Verification
Morrisville, NC 27560

Stanford L. Warren Library Building Improvements
Renovation
Post-Bid
Durham, NC 27707

Conversion of Reception Desk to Work Room at Marshville Library
Renovation
Results
Marshville, NC 28103

Development Services - Library and Senior Center Facility
New Construction, Infrastructure - 40,000 SF
Post-Bid
Concord, NC 28027

Library Construction Manager at Risk
New Construction
Results
Sanford, NC 27330

Gaston County Library Renovations
Renovation
Results
Gastonia, NC 28054

Reported 03/23/2022 12:00 AM
Project Title

CM at Risk for a New Southwest Regional Library and Associated Improvements

Physical Address View project details and contacts
City, State (County) NC   (Union County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work in this project includes providing construction manager at risk services relating to design and construction of a new Southwest Regional Library and associated improvements. The firm selected will be required to provide construction manager at risk services in conjunction with the following firms currently under contract and providing professional services related to the design and construction of the Southwest Regional Library and associated improvements.Little Diversified is providing full architectural and engineering services. McDonough, Bolyard, Peck, (MBP, Inc) is providing building commissioning services and Kleinfelder will be performing special inspections and construction material testing services all relating to the design and construction of a new Southwest Regional Library and associated improvements. --- Informal Bid Packages Work that will not be part of the formal bid process and will not require submitting a prequalification statement: 01-001 Final Cleaning 03-002 Precast Concrete 07-002 Waterproofing and Sealants 07-003 Air Barrier 08-001 Doors, Frames, Hardware 09-004 Tile 10-001 Specialties 10-002 Signage 10-003 Canopies 10-004 Appliances 12-001 Window Treatments 32-002 Fencing

Details

Library - Public, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents