Last Updated | 06/01/2023 04:03 PM |
Project Title | SLCC Storage Building for Westpointe Campus |
Physical Address | View project details and contacts |
City, State (County) | Salt Lake City, UT 84116 (Salt Lake County) |
Category(s) | Commercial, Education, Heavy and Highway |
Sub-Category(s) | College/University, Site Development, Warehouse/Storage |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $650,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is to build a storage building for Salt Lake Community College at their Westpointe Campus. This will be a premanufactured building with additional features to match the existing structure. Trades include: Concrete, Masonry, Structural Steel, Steel Decking, Metal Fabrications, Sheathing, Metal Plate Wall Panels, Joint Sealants, Sectional Doors, HP Coatings, Fire Extinguishers, Metal Building Systems, HVAC, Electrical, Construction Cost Estimate: $ 650,000.00 A bid bond in the amount of five percent (5%) of the bid amount, made payable to Salt Lake Community College on AIA's bid bond form A310-2010, shall be uploaded under vendor attachments section with the bid response. If the bid bond is not furnished with the bid, the bid will be considered non-responsive. Liquidated damages per day: $300.00 Project Completion Date: September 29, 2023 All bids shall remain valid for a minimum of 45 calendar days after the Due Date to allow adequate time for evaluation. Question Submission Close Date 5/11/2023 2:00 PM MDT The Question and Answer period closes on date and time specified on U3P. All questions must be submitted through U3P during the Question and Answer period. Answers from SLCC will be posted on U3P. Questions may include notifying SLCC of any ambiguity, inconsistency, scope exception, excessively restrictive requirement, or other errors in this IFB. Exceptions/additions to the Contract Terms and Conditions must be addressed during the Question and Answer period. Questions are encouraged |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |