Similar Projects
Residential and Commercial Municipal Solid Waste and Recycling Collection and Disposal Services
Post-Bid
Avondale Estates, GA

Horse Manure Removal Services
Term Contract
Post-Bid
Decatur, GA 30033

Dumpster Service
Infrastructure
Post-Bid
Decatur, GA

Right of Way Maintenance Services
Term Contract
Bidding
Stonecrest, GA

Garbage Services for Central State Prison
Term Contract, Infrastructure
Post-Bid
Atlanta, GA 30316

Horse Manure Removal Services - Annual Contract
Term Contract
Post-Bid
GA

Semi-Automated Residential Garbage Containers
Infrastructure
Bidding

Nuisance Abatement and Remediation Services
Term Contract
Post-Bid
Atlanta, Clarkston, Decatur, Lithonia, Scottdale, Stone Mountain, GA 30088

Scrap Tire Abatement At Southeast & Northeast Ga
Alteration
Post-Bid

Invasive Plant Control and Woodland Restoration
Post-Bid
Decatur, GA 30030

Rich Mt WMA Timber Sale
Term Contract
Post-Bid

Lawn Care Maintenance
Post-Bid
Decatur, GA

Winters Chapel Trail 16P Site Clearing
Infrastructure
Post-Bid
Dunwoody, GA 30338

Tucker Streetscape Landscaping Project
Results
Tucker, GA

North Decatur and Scottdale Underpass Project
Results
North Decatur, Scottdale, GA

Reported 03/17/2022 12:00 AM
Project Title

Emergency, Non-Emergency Tree and Debris Removal Services

Physical Address View project details and contacts
City, State (County) Sandy Springs, GA   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling, Landscaping
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Contractor shall be available to respond on an emergency basis 24 hours a day, weekdays, weekends and on holidays to remove, t r i m trees or vegetation in the City Rights-of-way that pose a hazard to public or private property and the traveling public. Upon notification by the City of Sandy Springs, the Contractor will respond within two (2) hours with appropriate staff and equipment as outlined in this scope, to the location of the hazard. The contractor shall provide at a minimum, a standard maintenance crew consisting of a minimum of three (3) people, one (1) chipper and truck, and one (1)aerial tower truck. One (1) crane truck with one (1) operator shall also be available on an as needed basis. This crew shall be able to respond within two hours of notification. In the event of multiple emergencies, additional crews may be added as requested by the Director of Public Works or his designee. The Contractor will remove the hazard from the Right-of-way as directed. The Contractor will also remove any and all debris associated with the removal of the hazard including but not limited to logs, branches, leaves, saw dust, and limbs; and will dispose of said debris legally and responsibly. The Contractor will be required to provide all appropriate traffic control, to include but not limited to flaggers, cones, barricades, required in the current edition of the MUTCD.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents