Similar Projects
Crookston Lift Stations 1-4 Ventilation System Improvements
Alteration
Bidding
Crookston, MN

Improve Cooling Tower at BCA - Maryland Facility
Alteration
Bidding
$600,000 est. value
Saint Paul, MN 55106

MBC - Alerton Controls Services
Term Contract
Post-Bid
Minneapolis, MN

F108--Chemo Hood Vent Decontamination and Disposal St. Cloud
Post-Bid
Saint Cloud, MN

HVAC System Replacement
Results
Grand Rapids, MN 55744

HVAC Upgrades
Results
Minneapolis, MN 55411

Crossroads Mall Climate Controlled Storage
Renovation, Build-Out, Alteration - 10,600 SF
Pending Verification
Hastings, MN 55033

Locker Room AHU Replacement
Alteration
Bidding
Austin, MN 55912

Natatorium HVAC
Post-Bid
Rochester, MN

Crooked Lake ES HVAC Replacement and Deferred Maintenance Phase 2
Results
Andover, MN 55304

HVAC Replacement Systems
Alteration
Bidding
Columbia Heights, Hilltop, MN 55421

HVAC and Mechanical Products
Term Contract
Post-Bid

Johnson High School HVAC Replacement
Results
Saint Paul, MN 55106

New Heights Elementary School, South Point Elementary School, Central Middle School - 2021 Improvements
Post-Bid
East Grand Forks, MN 56721

Washington Elementary School HVAC Improvements
Results
Mankato, MN 56001

Last Updated 11/19/2021 12:02 PM
Project Title

MAPS Lincoln Community Center HVAC Improvements 2021

Physical Address View project details and contacts
City, State (County) Mankato, MN 56001   (Blue Earth County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed renovations at the community center facility is to replace all the existing mechanical equipment and improve the indoor air quality of the building. This includes new central heating plant, central chiller plant and all piping for dehumidification, controls upgrade, and install new fire protection system. Replacement of lighting fixtures throughout the building to upgrade to LED fixtures. Removal and installation of ceilings throughout the building to support the new mechanical systems along with painting and patching of walls and soffits.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents