Similar Projects
Finish Site Plan Work for New Marina Office
New Construction, Infrastructure
Conception
$116,643 CJ est. value
Islamorada, FL 33036

Sombrero Beach Sand Renourishment - City of Marathon
Infrastructure
Conception
$416,000 CJ est. value
Marathon, FL 33050

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Green Turtle Hammock Nature Preserve Improvements
New Construction, Infrastructure
Bidding
$5,077,870 CJ est. value
Islamorada, FL 33036

Green Turtle Hammock Nature Preserve Improvements
New Construction, Infrastructure
Bidding
$5,077,870 CJ est. value
Islamorada, FL 33036

Diesel Pump Upgrades at J. Robert Dean Water Treatment Plant
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Florida City, FL 33034

Fishermen's Community Hospital - Medical Arts Building
New Construction, Infrastructure - 9,990 SF
Post-Bid
$3,000,000 CJ est. value
Marathon, FL 33050

Key Largo Park Walking Path Asphalt Repair
Infrastructure
Results
Key Largo, FL 33037

Silicone Joint Sealer
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Sea Breeze Mobile Home and RV Park
New Construction, Build-Out - 25,974 SF
Construction
$1,000,000 est. value
Islamorada, FL 33036

Duck Avenue Supportive Housing Development
New Construction, Infrastructure, Renovation
Pending Verification
$40,600,000 CJ est. value
Key West Nas, FL 33040

Duck Avenue Supportive Housing Development
New Construction, Infrastructure, Renovation
Pending Verification
$40,600,000 CJ est. value
Key West Nas, FL 33040

Key West Bight Street Parking - City of Key West
Infrastructure
Conception
$2,210,946 CJ est. value
Key West Nas, FL 33040

Last Updated 07/24/2023 12:14 PM
Project Title

Frederick Douglass Community Center

Physical Address View project details and contacts
City, State (County) Key West Nas, FL 33040   (Monroe County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $7,985,928 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The design and furnishing of all materials, equipment and labor for the construction of FREDERICK DOUGLASS COMMUNITY CENTER(FDCC) and all necessary appurtenances and record drawings, surveys, and incidental work to provide a complete and serviceable project identified as follows: FREDERICK DOUGLASS COMMUNITY CENTER(FDCC) Work to include all materials necessary to construct the proposed one-story building and site work at the address and location shown in the construction drawings dated March 10, 2023. The new site work includes, but is not limited to, parking spaces, bicycle racks, landscaping, ADA walkways, pavers, and fencing. The scope of work also includes demolition of the existing single-story building, removal of the existing parking lot, and the relocation of trees from the project site to the Fort St parking lot per plan L1.1.1 (Fort St) Demolition of 6,114 SF Building and construction of new 9,587 SF 1-Story Building Although a firm timeline for construction has not been determined, construction is not expected to commence prior to July 2023. Construction is expected to take 440 calendar days with an estimated completion in September 2024. Question Deadline 05/08/2023

Details

1 Story Above Grade, 9,587 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents