Similar Projects
Forest Hills Pipe Lining
Infrastructure
Bidding
North Charleston, SC

Safety Improvements - US 278
Infrastructure
Bidding
SC

GLDTC 567 - Rothwell Drive/ Millport Circle Relocation
Post-Bid
$500,000 to $1,000,000 est. value
Mauldin, SC 29662

Purchase of Reinforced Concrete Pipe (RCP)
Post-Bid
North Charleston, SC 29405

Clinton Recreation Complex
Results
$1,644,211 est. value
Clinton, SC

GLDTC 556-Fountain Inn High School Road Improvements
Results
$2,000,000 to $3,000,000 est. value
Fountain Inn, SC 29644

Safety Improvements - SC 90 (Horry County)
Infrastructure
Bidding
SC

Asphalt Projects
Post-Bid
Anderson, SC 29621

Shiloh Unity Road Phase 1 Sales Tax Program 9
Results
Less than $3,204,032 est. value
Lancaster, SC 29720

Safety Improvements - Spartanburg/Greenville County
Infrastructure
Bidding

Grier Street Road Improvements
Post-Bid
Sumter, SC 29150

Rehabilitation - Bamberg County
Results
SC

Avenue of the Carolinas Intersection Improvements - Carowinds Boulevard Project
Infrastructure
Bidding
$2,660,000 est. value
York, SC

Campus Village Residential Development - South Tunnel Stabilization
Post-Bid
$600,000 to $800,000 est. value
Columbia, SC 29208

I-95 Asphalt Patching - Districts 5 and 7
Results

Last Updated 08/02/2021 05:40 PM
Project Title

Roadway, Water, and Wastewater Improvements for theHardeeville Commerce Park

Physical Address View project details and contacts
City, State (County) Hardeeville, SC   (Jasper County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Roadway, Water, and Wastewater Improvements for the Hardeeville Commerce Parkin City of Hardeeville. Generally, the project includes the construction of approximately 1,425 LF of 12-inch ductile iron waterline, 2,425 LF of 8-inch PVC waterline, 3,735 LF of 8-inch PVC gravity wastewater line, a pump station, 455 LF of 6-inch PVC forcemain and 6,100 LF of roadway improvements and associated drainage infrastructure.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents