Similar Projects
HPW - Wastewater Collection System Rehabilitation and Renewal
Infrastructure
Bidding
$3,200,000 est. value
Houston, TX

Construction of Water, Sewer and Drainage Facilities to Serve Coastal Point, Section 6
Infrastructure
Bidding
$300,000 est. value
Houston, TX

Sanitary Sewer Repair and Rehabilitation Project
Post-Bid
$150,000 to $200,000 est. value
TX

Imperial Forest Section 5
Post-Bid
Houston, TX

Water Distribution, Sanitary Sewer and Drainage Facilities to Serve Woodland Lakes Section 4
Results
TX

Enclave at Cypress Springs
Results
TX

Sidewalk Extension Along Birnham Woods Drive
Infrastructure
Bidding
$500,000 est. value
Spring, TX 77386

Sanitary Sewer Phase 5 Television Inspection
Infrastructure
Post-Bid
$113,000 est. value
Houston, TX 77282

Water and Sanitary Facilities for Big John Street
Results
Less than $198,996 est. value
Spring, TX 77383

Construction of Water Distribution and Sanitary Sewer Collection To Serve Rothwood Center - 22131 Rothwood Road
Infrastructure
Bidding
$200,000 est. value
Spring, TX 77389

Y1nz--580-20-103 Replace Sanitary Sewer Lines B-100
Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
Houston, TX 77030

Sanitary Sewer Repairs Phase 5
Results
Houston, TX 77027

2022 Sanitary Sewer Cleaning and Televising
Infrastructure
Bidding
Houston, TX

Storm Sewer, Sanitary Sewer and Water Lines to Serve Morton Creek Ranch Sections 24 and 26
Infrastructure
Post-Bid
TX

Proposed Sanitary Sewer CIPP - 2020-2021
Results
$150,000 est. value
Houston, TX 77040

Reported 06/08/2022 12:00 AM
Project Title

2022 Sanitary Sewer Cleaning and Televising

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of cleaning and televising approximately 30,977 linear feet of sanitary sewer pipe including 27,744 linear feet of 8-inch, 1,952 linear feet of 10-inch, 1,188 linear feet of 12-inch and 93 linear feet of 15-inch. The work also includes television inspection of 180 sanitary sewer manholes. The District is located in northwestern Harris County, Texas, approximately 15 miles northwest of the City of Houston's central business district. The District is bounded by Interstate Highway 45 on the east, Harris County MUD No. 205 on the north, the City of Houston on the south and southeast, and Rankin Road West MUD to the southwest. The Cranbrook subdivision is located within Harris County MUD No. 200 and bounded by Ella Boulevard to the east, Rankin Road West MUD to the west, the HCFCD Kuykendahl Detention Basin to the north, and the City of Houston to the south.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Operation and Maintenance of Utilities, Operation and Maintenance of Sewer Utilities, TV Inspection of Sewer Pipelines, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents