Similar Projects
Fairmount Elementary School 2021 HVAC Upgrades
Bidding
Downers Grove, IL 60516

Plaza Drive - HVAC Improvements
Bidding
Woodridge, IL 60517

Club Fitness Roof and HVAC Replacement
Post-Bid
Addison, IL 60101

On Call HVAC Repair Services
Term Contract
Post-Bid
West Chicago, IL 60185

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

Westmont Regional Center Roof Top Unit Replacement
Results
Westmont, IL 60559

Two Replacement A/C Rooftop Units
Renovation
Bidding
Naperville, IL 60540

Semi-Annual Duct, Hood and Fan Cleaning
Post-Bid
Wheaton, IL 60187

City Hall HVAC Upgrades
Results
Elmhurst, IL 60126

Coroner's Office Refrigerator and Freezer Replacement
Post-Bid
Wheaton, IL 60187

HVAC Controls and Hardware Upgrades
Results
West Chicago, IL 60185

HVAC System Startup and Preventative Maintenance 2021-2023
Term Contract
Post-Bid
Elmhurst, IL 60126

RTU and Bleacher Replacement at Lisle Senior High School
Results
Lisle, IL 60532

Annual HVAC Maintenance Contract
Term Contract
Post-Bid
Lombard, IL

Wood Dale Fire Station 69 - Repairs and Maintenance Improvement
Results
Less than $350,000 est. value
Wood Dale, IL

Last Updated 10/08/2020 10:24 AM
Project Title

2020 Prairie Building HVAC

Physical Address View project details and contacts
City, State (County) Wheaton, IL 60187   (DuPage County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid: Furnish and install four (4) high efficiency furnaces 80% AFUE with at least 70,000 BTU. Furnish and install four (4) Merv 5” filters on the furnaces. Furnish and install four (4) 2.5 ton/13 SEER condensers. Furnish and install four (4) 2.5 ton evaporator coils. Replace the four (4) 20 year old Bryant units first. The locations of the units will be discussed at the pre-bid meeting. Remove and dispose of existing furnaces, condensers and evaporator coils and reclaim existing refrigerant. Include all fittings needed to connect to existing refrigerant lines, ductwork, gas, electric and thermostats. ADDITION: Furnaces shall be 90 - 92% efficient – NOT 92% or higher.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents