Similar Projects
Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Sanitary Sewer Relocation
Post-Bid
Fond du Lac, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Tanager Street Extension
Renovation
Results
Waupun, WI 53963

Village of Brandon, CTH TC - WCPL
Results
Brandon, WI 53919

Fox Lake - Waupun, Edgelawn Drive to West Street, C. Waupun, Fox Lake Street, West Street to STH 49
Results
Fox Lake, Waupun, WI 53933

V. Oakfield, CTH D, CTH Y - N. School Street
Results
Oakfield, WI 53065

Baumann Street - Triple S Road Improvements
Results
Campbellsport, WI 53010

STH 23 Utility Relocation
Results
Less than $750,000 est. value
Fond du Lac, WI

Fond du Lac - Plymouth, USH 151 - Seven Hills Road
Results
Fond du Lac, Plymouth, WI

Bechaud Avenue and Polk Street Improvements - Roadway Construction
Results
North Fond du Lac, WI 54937

2021 Street and Utility Construction
Results
Fond du Lac, WI

Dix Road Roadway Reconstruction
Results
Mount Calvary, WI 53057

2021 Sidewalk Management Program
Results
Fond du Lac, WI

Last Updated 02/25/2021 01:23 AM
Project Title

Newton Avenue and Rock Avenue Reconstruction - Phase 1

Physical Address View project details and contacts
City, State (County) Waupun, WI 53963   (Fond du Lac County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Includes the following: 2,200 l.f. of 8" diameter sanitary sewer replacement and laterals; 2,200 l.f. of 6" and 8" diameter water main replacement and services; 1,800 l.f. of storm sewer replacement (sizes ranging from 12" to 30" diameter) and miscellaneous storm laterals; 340 l.f. of 72"x120" concrete box culvert replacement; 4,000 l.f. of concrete curb gutter; 15,800 s.f. of concrete sidewalk; 7,500 s.y. of asphaltic roadway; as well as spot driveway replacement, site grading/earthwork, casing pipe installation under Harris Creek, grading improvements along Harris Creek, surface restoration, cleanup, and related miscellaneous construction

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents