Similar Projects
CHRL Pump Station 1a, 2, & 3
New Construction
Conception
$750,000 est. value
WA

Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Richmond Beach Pump Station Low Voltage Switchboard and MCC Replacement
Alteration
Results
$2,558,000 est. value
Seattle, WA 98177

Airlift Pump Station 38 Replacement
Renovation
Results
$1,300,000 est. value
Seattle, WA 98116

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

California Avenue Southwest Apartments
Demolition, New Construction, Infrastructure - 98,536 SF
Construction
$18,000,000 CJ est. value
Seattle, WA 98116

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

SR 410/0.75 miles W of East Winter Gate - Culvert Lining
Infrastructure
Conception
$450,000 CJ est. value
Enumclaw, WA 98022

18th Avenue Mixed Use Development
New Construction, Infrastructure - 56,355 SF
Design
$29,000,000 CJ est. value
Seattle, WA 98106

Last Updated 03/13/2023 07:32 PM
Project Title

Game Farm Park Pump Station/Distribution System Improvements - City of Auburn

Physical Address View project details and contacts
City, State (County) Auburn, WA 98002   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2027
Bids Due View project details and contacts
Estimated Value $329,774 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The pumps at Game Farm Wilderness Park are in need of replacement, and the building need repairs. This project was identified in the 2015 Comprehensive Plan as occurring in the short to mid term, or by 2025. Installation of new water main crossing the White River to eliminate the pump station was identified as being completed by 2035. The Coal Creek Springs Transmission Main project will add a pipe crossing the White River to be used for installation of a water main for Game Farm Wilderness Park. Completion of the river crossing will enable the water main project to be completed sooner and eliminate the need for pump station improvements. This project will install new main within the Game Farm Park from the existing 8" near the amphitheater to the river crossing, and from the river crossing to the existing pump station in the Wilderness area. The project will also decommission the existing pump station. As of March 13, 2023, this project is currently in the FY 2022-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction Fy 2027. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents