Last Updated | 12/28/2023 02:02 PM |
Project Title | ISW Bronzeville Corridor Improvements: 47th Street, S. Prairie Avenue To S. Evans Ave. (SBI) |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60604 (Cook County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected February 2024 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This work will consist of inserting a duct rod or electrical fish rod or tape of sufficient length and rigidity into an electrical conduit opening in one electrical manhole or handhole, and pushing the said rod through the conduit to emerge at the next or subsequent manhole in the conduit system at the location shown on the plans. The duct rod may be inserted and removed by any standard construction method which causes no damage to the conduit system. The size of the conduit may vary from two inch (2") to four inch (4"), but there will be no differentiation in cost for the size of the conduit. The conduit system which is to be rodded and cleaned may exist with various amounts of standing water in the manholes. The contractor must pump the water or sufficient water from the manholes to drain the conduit and to afford compatible working conditions for the installation of the duct rods and/or cables. The pumping of the manholes will be incidental to the work of rodding and cleaning of the conduit. Deadline for Questions: 04:00 PM Central Time, 21-NOV-2023 Buyer: STEWART, STACY Email Address: Stacy.Stewart@cityofchicago.org Site Visit Date & Time: N/A Site Visit Location: N/A BID DEPOSIT: 5% of the Total Base Bid PERFORMANCE BOND: When required by the Chief Procurement Officer the successful bidder shall furnish a performance bond in the full amount of the contract. It is understood and agreed that TIME IS OF THE ESSENCE IN THIS CONTRACT, and the Contractor agrees to begin actual work covered by this Contract after notification by the Commissioner to commence work and to prosecute the same with all due diligence so as to complete the entire work under the Contract within 340 CALENDAR DAYS after Notice to Proceed has been issued. It is understood that "Completion" shall mean completion to the point of acceptance by the Commissioner, i.e. substantial completion/beneficial occupancy. Completion of all Work: $ 2,300.00 per calendar day Completion of "Punch List" Work: $ 2,300.00 per calendar day |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |