Last Updated | 09/21/2022 05:32 AM |
Project Title | Monida Creek Dam 1 and 2 Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | Bannack, MT 59725 (Beaverhead County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Request for Qualifications, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $497,137 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Sep 19, 2022 Contract Award Number: 140L0622C0026 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: FSZ9KCFSEJT3 Contractor Awarded Name: CIRCLE V HARVESTING CO. Contractor Awarded Address: Sneedville, TN 37869-6425 USA Base and All Options Value (Total Contract Value): $497137.12 Type of Contract: Construction, Firm Fixed Priced (FFP), Single Award Contract County: Beaverhead County, MT Type of Construction: Heavy FAR Magnitude: Between 250K and $500K NAICS: 237990 SIZE STD: $39.5M SET-ASIDE: Total Small Business Proposal Submittal Information: Site Visit: 30 June 2022 / 10:30 AM Local Time (See clause instructions below / FAR 52.236-27) Questions Due Date: 11 July 2022 / 2PM Mountain Time Proposal Due Date 22 July 2022 / 2PM Mountain Time All material, equipment, labor, and supervision to perform Monida Creek Dam #1 and #2 Reconstruction in accordance with the attached plans, specifications, and associated attachments. Product/Service Code: Z2KA Product/Service Description: REPAIR OR ALTERATION OF DAMS Period of Performance: 08/01/2022 to 10/31/2022 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (April 1984) The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after receipt of the notice to proceed. The time stated for completion shall include final cleanup of the premises. WORK HOURS The performance period established for this contract is based upon all work being conducted during regular working hours between 7:00am and 5:30pm, Monday through Friday, excluding government holidays. If the contractor desires to carry on work outside regular hours (Saturdays, Sundays, government holidays), a written request must be submitted to the contracting officer in sufficient time allow satisfactory arrangements to be made by the government for access to the work site and inspection. H-2 FIRE DANGER SEASON If the contracting officer representative (COR) allows the contractor to continue work during periods of declared fire danger or season, the contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR. H-3 DRAWINGS (a) Typical Drawings. Any drawings titled typical are general only and dimensions of each structure will be fixed by the contracting officer to adapt the design to existing conditions at the structure location. (b) Reduced Size Drawings. Any drawings identified as "REDUCED SIZE DRAWINGS" appearing in the solicitation are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective offerors desiring to review a copy of the full-size drawings may contact the primary contracting office point-of-contact contracting identified in the solicitation. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The subject requirement consists of all labor, materials, equipment, and supervision to reconstruct two impoundment dams on an arm of Lima reservoir in the lower Centennial Valley that were created as wetlands for waterfowl production. The dams will be reshaped and armored on the reservoir side of the dams to prevent future ruin. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |