Similar Projects
Construction a Street Rebuild Projects 2020 Project
Bidding
Less than $1,000,000 est. value
Centerville, UT 84014

South Frontage Road Widening Project
Bidding
Less than $125,000 est. value
Centerville, UT 84014

Asphalt
Post-Bid
UT

2019 Streets Project
Post-Bid
Plain City, UT

DFCM Construction-Pre Qualification for General/Mechanical/Electrical/Roofing/Paving Contractors
Results
$3,500,000 est. value

DFCM Construction-Pre Qualification for General/Mechanical/Electrical/Roofing/Paving Contractors
Results
$3,500,000 est. value

Asphalt Replacement, Repair, and Maintenance
Construction
Ogden, UT 84201

Weber State Davis Campus Access Road
Post-Bid
Layton, UT 84041

2018 Crack and Slurry Seal Project
Results
Less than $400,000 est. value
Centerville, UT

4000 North Road/Trail Expansion Project from 2500 West to City line
Post-Bid
Farr West, UT

Jefferson, 4400 to 4500;4500, Jefferson to Madison Pedestrian/Bike facility
Results
Less than $500,000 est. value
UT

2019 Trail Maintenance Project
Post-Bid
West Haven, UT

DDHU Lot 3 Repairs at Hill AFB, UT
Results
$5,000,000 to $10,000,000 est. value
Ogden, UT 84056

Street Overlay Projects 2019
Post-Bid
$500,000 est. value
Centerville, UT 84014

I-84; SR-26 to US-89
Results

Last Updated 03/26/2019 05:54 AM
Project Title

I-15 SR-232 to I-84 Widen Existing Facility

Physical Address View project details and contacts
City, State (County) (Davis, Weber Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000,000 to $125,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The 1-15 corridor is the main transportation facility and primary commuter route that links the economic hubs along the Wasatch Front between Utah and Weber Counties. The objective of this project is to construct new Express Lanes on 1-15 (milepost 331) in Layton in north Davis County to Riverdale (milepost 340) in Weber County to better meet the needs of the commuters. The widening of 1-15 will primarily be accomplished by widening into the existing 1-15 median. This project also requires the widening of five sets (NB & SB) of bridges, deck replacements on four sets (NB & SB) of bridges, and 2 bridge replacements. This Project will connect approximately 80 miles of Express Lanes from Spanish Fork to Riverdale. The widened sections of 1-15 will be constructed with an HMA pavement section. The Project will also include pavement rehabilitation of the existing concrete pavement. Maintenance of Traffic is important to the Department. The Department will require 3-lanes remain open in each direction during peak hours. The project is planned to advertise in November of 2018 and the duration of construction is anticipated to cover two construction seasons in 2019 and 2020.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents