Similar Projects
Construct Wildlife Shop Facility
New Construction, Infrastructure
Conception
$1,970,900 est. value
Waukesha, WI

Store-It Right Storage Facility / Pabst Farms Commerce Center
New Construction, Infrastructure - 122,000 SF
Design
$13,000,000 CJ est. value
Oconomowoc, WI 53066

Bike Path
Term Contract
Post-Bid
Brookfield, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Crackfill
Results
$100,000 est. value
Merton, WI 53056

National Heritage Academies / Waukesha
New Construction, Infrastructure - 45,000 SF
Construction
$9,500,000 CJ est. value
Waukesha, WI 53189

ABB Inc. Headquarters
New Construction, Infrastructure - 301,320 SF
Construction
$161,000,000 CJ est. value
New Berlin, WI 53146

2023 Road Program: Utility Repairs And Roadway Resurfacing Professional Services
Infrastructure
Post-Bid
Sussex, WI

2021 Road Program Restoration
Renovation
Results
Brookfield, WI 53005

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Seal Coating
Infrastructure
Post-Bid
Merton, WI

Pewaukee Sports Complex Sidewalks and Bleacher Pads
Infrastructure
Results
Pewaukee, WI

2022 Road Improvement Program
Infrastructure
Post-Bid
Muskego, WI

Asphalt Paving
Infrastructure
Results
Elm Grove, WI 53122

Last Updated 02/09/2023 07:43 AM
Project Title

Meadowview Park - New Park Development - City of Waukesha

Physical Address View project details and contacts
City, State (County) Waukesha, WI 53188   (Waukesha County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $4,050,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The park has experienced phased development since 2017. The following items have been completed: grading biofilter areas, mass grading of the park, installation of an asphalt pathway and the east parking lot, seeding of the lawn and native grass areas, parking lot and pathway lighting, stubbing out of utilities such as electric, sanitary and water, installation of a small footbridge, installation of a playground through the use of community build, planting of trees, establishing the lawn and native prairie areas, cleaning the west tree line of dead and invaisive trees. Project is included City of Waukesha FY 2023 - 2027 CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents