Similar Projects
Hillon Hood Road - Gas Improvements
Infrastructure
Results
$850,000 est. value
LA

Terrebonne High School Hydronic Piping Replacement
Infrastructure
Bidding
Houma, LA 70360

Replacement of Natural Gas Distribution Facilities along LA Highway 421 and Phase 3 within the Lake Rosemound Area
Infrastructure
Post-Bid
$525,000 est. value
LA

Gas Service to Greenwood Park and Baton Rouge Zoo project
Infrastructure
Results
$670,000 est. value
Baker, LA

Phase 3: Rehabilitation of Texas Street Elevated Water Tank
Infrastructure
Results
LA

LUS Gas Pipeline Relocation - Potpourri Village
Infrastructure
Bidding
Lafayette, LA

6" PE Extension of Natural Gas Facilities to Serve the Bluffs on Thompson Creek and Surroundings Areas
Infrastructure
Post-Bid
Saint Francisville, LA

LA 93 : US 90 - Benoit Patin Road Gas and Water Main Relocation
Infrastructure
Bidding
Scott, LA

Aviation Fuel System Rehabilitation
Infrastructure
Post-Bid
$240,500 est. value
Gonzales, LA 70737

Aviation Fuel System Improvments
Infrastructure
Post-Bid
$291,000 est. value
LA

Remove, Furnish and Install Fuel Pumps for KPD
Infrastructure
Post-Bid
Kenner, LA 70062

6 PE Extension of Natural Gas Facilities to Serve the Livingston Parish Sheriffs Office Training Facility on Woodside Drive
Infrastructure
Bidding
$299,500 est. value
Livingston, LA 70754

Reported 02/17/2022 12:00 AM
Project Title

Gas Line Repair - DOC

Physical Address View project details and contacts
City, State (County) Angola, LA 70712   (West Feliciana County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To remove above and below ground tanks, piping, and valves pertaining to the mercaptan odorant gas system located at Louisiana State Penitentiary and will repair the existing natural gas main and perform all necessary excavation and back filling at jobsite and will make two (2), eight (8) inch line stoppers with a temporary bypass, remove the old leaking odorizer and valve set, then replace with all new below ground pipe and valve.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents