Similar Projects
Lathrop High School Kitchen Remodel - Fairbanks North Star County
Addition, Demolition, Renovation, Infrastructure
Conception
$2,200,194 CJ est. value
Fairbanks, AK 99701

Pearl Creek Elementary School Traffic Safety - Fairbanks North Star County
Infrastructure
Conception
$1,530,000 CJ est. value
Fairbanks, AK 99709

EIE431A F-35 Demolition of Building 1303
Demolition - 5,700 SF
Design
$1,000,000 to $5,000,000 est. value
Eielson AFB, AK 99702

FTW469 Repair Barracks B3718 and FGT251 Maintenance Support Facility
Renovation - 24,000 SF
Design
$50,000,000 CJ est. value
Fairbanks, AK 99703

RFP D/B - Repair Lift Station B2212
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Eielson AFB, AK 99702

FAST Area Surface Upgrades FFY2023
Infrastructure
Bidding
$2,500,000 CJ est. value
Fairbanks, AK 99701

Dalton Hwy MP 0-9 Reconstruction CMGC
Infrastructure
Post-Bid
$30,000,000 to $40,000,000 est. value
Fairbanks, AK

RFP Engineering - FAI GA Apron and Taxiway Reconstruction
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Fairbanks, AK 99709

EAR069 Demolition Dormitory Buildings 751 and 753
Demolition - 57,317 SF
Results
Eielson AFB, AK

Old Richardson Highway Intersection Improvements
Infrastructure
Results
AK

Old Richardson Highway Intersection Improvements - State of Alaska
Infrastructure
Pending Verification
$830,000 CJ est. value
Fairbanks, AK 99705

Old Richardson Highway Intersection Improvements - State of Alaska
Infrastructure
Pending Verification
$830,000 CJ est. value
Fairbanks, AK 99705

Baseball Consolidation at Growden Park - Fairbanks North Star County
Infrastructure
Conception
$1,525,350 CJ est. value
Fairbanks, AK 99701

Elevator install and Fire Safety Update
Renovation
Design
$500,000 CJ est. value
Eielson AFB, AK 99702

RFP Design - Pioneer Park Alaska-Themed Playground Conceptual Design Services
Infrastructure
Post-Bid
$3,500,000 CJ est. value
Fairbanks, AK 99701

Last Updated 06/14/2023 12:16 PM
Project Title

RFQ Engineering- Conceptual Charrette Reports Repair Lima Row Apron

Physical Address View project details and contacts
City, State (County) Fairbanks, AK 99702   (Fairbanks North Star County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Request for Qualifications, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $22,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 14, 2023, information regarding award and award date has not been disclosed. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: This notice is a sources sought. The Sources Sought notice is a synopsis posted by a Government agency seeking possible sources for a project. This notice is not a solicitation for work or a request for proposal. The purpose of this notice is to identify interested and capable vendors to perform the work described below and to incorporate the results of this notice into the Government's Market Research Report. Please review the Government's draft statement of objectives. Respond to this notice by emailing SSgt Lukas M. Anderson at lukas.anderson@us.af.mil stating your organization's interest in accomplishing this effort. QUESTIONS: All questions regarding this synopsis must be submitted in writing no later than Monday, 26 July 2021 at 2:00 PM AKST. This Statement of Objectives (SOO) defines requirements for A-E services to provide Conceptual Charrette Reports for the repair of Lima Row apron at Eielson AFB, AK. The Contractor shall furnish the personnel, services, equipment, materials, facilities, and other requirements necessary for, and incidental to, the performance of work set forth herein. Primary technical services shall be performed by individuals who are credentialed members of architectural, planning, science, and engineering professions. Disciplines include, but are not limited to, fire protection engineers, architects, landscape architects, interior designers, engineering disciplines typically associated with design and construction, cost estimators, specification writers, Computer Assisted Design and Drafting (CADD) technicians, publication writers/editors, technical writers, graphic artists, Geographic Information System (GIS) analysts, planners, urban designers, economists, and financial analysts. Personnel shall be registered in the state of Alaska and command the necessary expertise and knowledge to perform the tasks identified herein. 1.1 PROJECT BACKGROUND INFORMATION The existing Lima Row AC pavement has block, alligator and longitudinal/transverse cracks; patches; depressions and weathering/raveling in sections A10B, A40B, A11B, T13A, T44A, and T27A. The pavement has a condition index of 64 and is deteriorating. The scope for this project includes removing existing AC pavement, scarifying and re-compacting base course and placing new AC pavement. The existing base course material should be replaced as needed. Repairs will also include saw cutting and sealing control joints for thermal cracking, restoration of pavement markings and other related work. 2.0 GENERAL PROJECT REQUIREMENTS The A-E shall perform professional architectural and engineering services such as planning, investigation, study, surveying and provide labor and materials to accomplish the work specified in this contract. The A-E shall be responsible for all travel and lodging arrangements and expenses involved in the performance of work under this contract. The A-E shall furnish the Air Force with complete and usable products to include: planning documents, investigative reports, conceptual charrette reports, design analyses, project concept drawings, conceptual equipment layouts, cost estimate, and other documents required under this contract to provide complete engineering investigation services for Eielson AFB, Alaska. Work on the project may involve disciplines such as: A-E project management; architectural; civil, structural, mechanical, electrical and fire protection engineering; possible limited geotechnical engineering; drafting (AutoCAD); limited surveying; hazardous materials survey / testing and abatement planning; contaminated soil remediation planning; cost estimating; and computer word processing Programmed Amount (PA) [current programmed amount of construction cost] for the proposed renovation is $22,500,000. The method of contractor selection has not been determined at this time

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents