Similar Projects
Runway 18/36 and Taxiway A Pavement Maintenance
Bidding
Foley, AL 36535

Remark Runway 12/30 at Jeremiah A. Denton Airport
Bidding
Dauphin Island, AL 36528

Improvements to Dothan Regional Airport
Post-Bid
Dothan, AL

Construction of Scottsboro Airport Apron Reconstruction
Post-Bid
Scottsboro, AL 35768

Corporate Hangar Apron Rehabilitation
Results
Less than $2,015,057 est. value
Birmingham, AL 35212

Reconstruct Runway 4-22 at the Tuscaloosa National Airport
Results
Tuscaloosa, AL 35401

The Surface Rehabilitation of Airfield Pavement Located Between Taxiways A3 and A4
Post-Bid
Talladega, AL 35160

Taxiway Connector Relocation at Cullman Regional Airport
Results
Vinemont, AL 35179

Runway 14-32 Rehabilitation
Post-Bid
Mobile, AL 36615

Taxiway and Taxilane Seal Coat Surface Treatment
Results
Less than $490,000 est. value
Tanner, AL 35671

Pavement Maintenance - Runway 18/36 at Atmore Municipal Airport
Results
Less than $225,927 est. value
Atmore, AL 36502

Corporate Taxilane
Results
Less than $278,981 est. value
Albertville, AL 35950

Southwest Apron Pavement Maintenance at H.L. Sonny Callahan Airport
Results
$220,000 to $240,000 est. value
Fairhope, AL 36532

Rehabilitate Apron and Access Road at Camden Municipal Airport
Results
$250,000 to $300,000 est. value
Camden, AL 36726

St. Clair County Airport Taxilane Development - Phase 1
Results
Pell City, AL

Last Updated 08/06/2020 08:06 AM
Project Title

Parallel Taxiway

Physical Address View project details and contacts
City, State (County) Centre, AL 35960   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a full parallel taxiway at the Centre-Piedmont-Cherokee County Regional Airport. Improvements will consist primarily of the construction of an approximately 5,030 foot x 35 foot full parallel taxiway, connecting the existing midfield connector taxiway and the existing eastern and western turn-arounds. The project will also include the construction of one additional connector taxiway between Runway (RW) 07-25 and the proposed parallel taxiway as well as widening existing taxiways and realigning the existing direct-connect taxiway.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents