Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Alley Reconstruction - Section D
Post-Bid
Westmont, IL

Maple Area Improvements
Infrastructure
Post-Bid
Villa Park, IL

2020 GM Roads Program
Results
Glen Ellyn, IL

Systemwide Roadway Appurtenance Repairs
Results
Downers Grove, IL

United Vein Centers
Renovation - 2,789 SF
Construction
Naperville, IL

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Building Demolition and Site Restoration
Demolition
Post-Bid
West Chicago, IL 60185

Illinois Youth Center Repair/Resurface Roadways Phase I
Results
$500,000 est. value
Warrenville, IL 60555

Elmhurst Dentistry For Kids
Addition, Build-Out - 196 SF
Construction
$127,400 est. value
Elmhurst, IL 60126

Station 28 Pavement Maintenance
Infrastructure
Post-Bid
Carol Stream, IL

2021 Road, Sewer, and Water Rehabilitation Program
Alteration
Results
Wheaton, IL

Veterinary Emergency Group
New Construction - 4,039 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Oak Brook, IL 60523

2021 Asphalt Paving and Patching Program
Alteration
Results
Lombard, IL

Last Updated 02/10/2023 08:07 AM
Project Title

Willowbrook Wildlife Center Phase B - Bid Group No. 3 - Bid Packages #11 - #32

Physical Address View project details and contacts
City, State (County) Glen Ellyn, IL 60137   (DuPage County)
Category(s) Heavy and Highway, Medical, Sewer and Water
Sub-Category(s) Maintenance, Medical Office/Outpatient, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Forest Preserve District of DuPage County, Illinois is accepting sealed bids for: Willowbrook Wildlife Center Phase 'B,' construction of a 27,500 sq.ft. clinic/visitor center. Such proposals as herein concerned shall be for the following as described: BID GROUP NO. 3 BID PACKAGES #11 - #32: Bid Package #11 - Concrete Bid Package #12 - Masonry Bid Package #13 - Structural Steel Bid Package #14 - Casework Bid Package #15 - General Trades Bid Package #16 - Heavy Timbers Bid Package #17 - Waterproofing Bid Package #18 - Aluminum Framed Openings & Glazing Bid Package #19 - Acoustical Ceilings Bid Package #20 - Flooring Bid Package #21 - Painting Bid Package #22 - Walk-in Coolers and Freezers Bid Package #23 - Elevators Bid Package #24 - Fire Suppression Bid Package #25 - Plumbing Bid Package #26 - HVAC Bid Package #27 - Electrical Bid Package #28 - Earthwork Bid Package #29 - HMA Pavement Bid Package #30 - Landscaping Bid Package #31 - Site Utilities Bid Package #32 - Roofing As an example: Bid Group 3- Bid Package #11 Concrete. Please complete the Required Bid Submittal Checklist Form, it is attached to this document. This advance registration is required for your bid to be recognized as compliant and to ensure all relevant and up-to-date information is received. Pre-qualification of all bidders in this bid group is required prior to the bid due date. Submit one fully executed copy of AIA Document A305 "Contractor's Qualification Statement" prior to submitting this bid form unless we have one on file. Please email to Jeaneen Turner- jturner@wightco.com. In addition to supplying this form, each trade Contractor is also required to answer the following questions and provide these answers with your AIA Document A305: 1) List of trade union agreements and date the current agreement expires. 2) Within the last seven years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract (if the answer is yes, please attach the details.) 3) On a separate sheet, list the major projects your organization has completed in the past five years giving the name of project, owner, architect, contract amount, date of completion and percentage of the cost of the work performed with your own forces 4) Trade/Supplier References (minimum of 3): The competency and responsibility of the bidders will be considered in making awards. The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid. Bonds shall comply with all laws of the State of Illinois governing public contracts let by governmental units. Bid security in the form of a Bid Bond, certified check or cashier's check made payable to Forest Preserve District of DuPage County in an amount equal to not less than ten percent (10%) of the Base Bid shall be submitted with the Bid. Bid security is required of all parties submitting a proposal. A fully executed and compliant Bid Security must be included with the Bid Form. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The Construction Manager for this project is Wight Construction Services, Inc. All questions concerning this project or those concerning bidding requirements should be directed to George Gardner email address: ggardner@wightco.com Questions must be received in writing, or via email (ggardner@wightco. com), until 12:00 PM. Thursday, February 2nd, 2023. The Forest Preserve District reserves the right to reject any or all bids, to negotiate contract terms with various Bidders, and to waive all formalities or irregularities to any bid when such is deemed by the Owner to be in the Owner's best interests.

Details

27,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents