Similar Projects
Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Solid Waste Organics Diversion - City of Brentwood
Infrastructure
Conception
$30,000,000 est. value
Brentwood, CA 94513

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Mount Diablo Boulevard Multi-Use Development
New Construction, Infrastructure - 4,300 SF
Design
$10,000,000 CJ est. value
Lafayette, CA 94549

RFQ Design - Planning, Design and Preparation of Construction Documents for the Sand Creek Sports Complex
New Construction, Infrastructure
Bidding
$15,000,000 CJ est. value
Brentwood, CA 94513

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

West County Mandarin School Play Structure
New Construction, Alteration
Post-Bid
Richmond, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Miner Road and Bear Creek Road Bridges Seismic Retrofit Project
Infrastructure
Results
$1,425,214 CJ est. value
Orinda, CA 94563

Hilton Garden Inn / Walnut Creek
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Walnut Creek, CA 94596

Alves Lane Apartments
New Construction, Infrastructure - 125,350 SF
Construction
$40,000,000 CJ est. value
Bay Point, CA 94565

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Walden Garden Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Walnut Creek, CA 94597

River Pumping Station Rehabilitation - 7690 - City of Antioch
Renovation, Infrastructure
Conception
$1,100,000 CJ est. value
Antioch, CA 94509

AutoZone #3343 / Pittsburg
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Pittsburg, CA 94565

Last Updated 05/04/2023 04:36 PM
Project Title

Basket Removal with CPS Replacement and Trash Capture Augmentation

Physical Address View project details and contacts
City, State (County) El Sobrante, CA 94803   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $98,715 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done generally consists of installing a 12-inch center-line rumble strip along the entire 3.41 mile unincorporated segment of Franklin Canyon Road between Cummings Skyway and Dutra Road. Striping will be reestablished with thermoplastic paint. General Location: El Sobrante, Crockett, Pacheco, and Bay Point Supervisory District: 1 & 5 Project Manager: Henry Hussey Bid Due Date: April 2023 Funding Source: Watershed Program SUA Funds, Local Road Funds Working Days: 40 Est. Construction Date: Summer 2023 The method of Contractor Selection has not been Determined at this time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents