Similar Projects
Improve Safety and Reduce Congestion on CS-1372 (Watson Lane)
Infrastructure
Conception
$6,340,000 CJ est. value
Robards, KY 42452

Newman Park Shelter - City of Henderson
New Construction, Infrastructure
Conception
$495,000 CJ est. value
Henderson, KY 42420

South Green Street Office
New Construction, Infrastructure - 9,120 SF
Design
$1,900,000 CJ est. value
Henderson, KY 42420

Pavement (With Alternates) - South Green Street (US 60)
Infrastructure
Bidding
$500,000 CJ est. value
Henderson, KY 42420

Kentucky Abandoned Storage Tank and Orphan Well Reclamation Program (KASTOW)
Renovation
Post-Bid
$320,000 CJ est. value
Robards, KY 42452

KASTOW- Orphan Well Package - Henderson 003
Infrastructure
Post-Bid
$625,000 CJ est. value
Robards, KY 42452

Facility Grading
Infrastructure
Results
Henderson, KY 42420

New 2.0 MG Elevated Water Storage Tank
New Construction, Infrastructure
Results
$5,460,700 CJ est. value
Henderson, KY 42420

Shamrock Technologies Facility Addition
Addition, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Henderson, KY 42420

River View Coal
New Construction, Infrastructure - 30,000 SF
Pending Verification
$35,000,000 CJ est. value
Robards, KY 42452

Address Pavement Condition of I-69
Infrastructure
Conception
$6,400,000 CJ est. value
Henderson, KY 42420

KASTOW - Orphan Well Package - Henderson 002
Infrastructure
Post-Bid
$625,000 CJ est. value
Robards, KY 42452

Asphalt Resurfacing - John James Audubon State Park Camp Ground
Infrastructure
Results
$362,570 CJ est. value
Henderson, KY 42420

West Main Street Industrial Building
New Construction, Infrastructure - 8,000 SF
Conception
$4,300,000 CJ est. value
Henderson, KY 42420

Kastow - Orphan Well Package - Henderson #004
Infrastructure
Post-Bid
$306,000 CJ est. value
Henderson, KY 42420

Last Updated 11/18/2022 11:03 PM
Project Title

Sand Lane Water Booster Station

Physical Address View project details and contacts
City, State (County) Henderson, KY 42420   (Henderson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,295,822 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pre-Qualification: Yes CONTRACT 22-05 - SAND LANE WATER BOOSTER STATION: o New Sand Lane Water Booster Station o Site Piping. The allotted time for construction of Contract 22-05 is 300 calendar days. Liquidated damages for non-completion are $1,000 per calendar day. The prospective bidder shall provide evidence of general ability to perform similar work in a timely manner by submitting the project name, scope of work, allowed and actual time of completion, and a contact person for three previous projects of this general nature constructed within the past ten (10) years. Alternatively, the prospective bidder shall list previous, specific experience on projects completed for the Henderson Water Utility in the past ten (10) years. The Contract is being funded through the Kentucky Cleaner Water Program. Bidders must comply and the project will be in compliance with the President's Executive Order No. 11246 (Equal Employment Opportunity) as amended, which prohibits discrimination in employment regarding race, creed, color, sex, or national origin. The Contractor/Subcontractor will comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities, and will apply the time tables and goal set forth in C41 FR 60-4, if applicable, to the area of the project. Bidders will make positive efforts to use small, minority, women-owned and disadvantaged businesses. Minorities and small businesses are encouraged to submit Bids on this project. The Contract(s) will be awarded to the lowest, responsive, responsible bidder whose bid provides the best value. The term "best value" means a procurement which is based on the primary objective of meeting the specific business requirements and best interests of the Owner. All applicable State Revolving Fund requirements must be met by the Bidder and all Subcontractors. Bid bond, City Occupational License, and other requirements apply to bidders. The successful bidder or bidders shall be required to furnish both an acceptable performance bond and payment bond each in the amount of one hundred percent (100%) of the contract price. The Owner reserves the right to reject any and all bids, to waive informalities, and to negotiate with the apparent qualified best bidder or bidders to such extent as may be necessary. No bidder may withdraw his bid for 90 days, while the Owner considers the bids. Mutually agreed upon time extensions may be made if necessary. Inquiries should be directed to the project manager, Stephen C. Lee, P.E., (615) 883-3243, stephenl@jrwauford.com.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents