Similar Projects
Highspire Terminals Parking Expansion
Conception
Middletown, PA 17057

JLG Industries - Land Development
Addition
Design
Greencastle, PA 17225

River Pointe Logistics Park
New Construction - 65,000,000 SF
Design
$10,000,000 CJ est. value
Mount Bethel, PA 18343

New Borough Administration, Police and Community Center - All Site Work
New Construction
Bidding
Trainer, PA 19061

Maia's Meadows - Infrastructure
New Construction
Post-Bid
Etters, PA 17319

Humboldt Industrial Park North
New Construction
Post-Bid
Hazleton, PA 18201

Phase 1 Site Improvements
Results
Cresson, PA

Ohara Elementary School Site Improvements
Results
Pittsburgh, PA 15238

Susquehanna Union Green - Sitework
New Construction - 496,148 SF
Construction
Harrisburg, PA 17110

New Jersey Central Railroad Train Station Improvement
New Construction - 32,000 SF
Construction
$1,200,000 est. value
Wilkes-Barre, PA 18704

Lower Allen Commons
New Construction
Design
Lower Allen, PA 17011

Penn Estates Roadway Paving/Roadway Repairs
Renovation
Post-Bid
East Stroudsburg, PA 18301

Fox Chapel Area High School Site Improvements Project
Results
Pittsburgh, PA 15238

The Mill at Easton Phase I & II
New Construction - 27,000 SF
Construction
$10,000,000 est. value
Easton, PA 18042

Authority Wide Site Improvements
Post-Bid
Pittsburgh, PA 15219

Last Updated 01/04/2021 12:29 PM
Project Title

Trolley Trail Multi-Use Trail Modifications and Appurtenances Installation / Construction Phase III

Physical Address View project details and contacts
City, State (County) Dalton, PA 18414   (Lackawanna County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method
Project Status Construction Complete as of fourth quarter 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1) Redevelopment of the Factoryville Trailhead - Resurface parking area (crushed stone), post and rail fencing, signage installation, drainage improvements on existing trail. (Factoryville Borough) 2) Limited Regrading (and drainage improvements), Fencing, and Signage along existing trail section between Cherry St. and West LaPlume Road 3) Trail related Modifications at Cherry Street - 1) Crossing of Cherry St. Signage, pedestrian pad and minimal regrading / drainage work); 2) formalize township access area at Cherry St. (gate, fencing, boulders, etc.); 3) culvert parapet repair work. 4) Trail related Signing and Pavement Markings: College Ave. between West La Plume Rd. and Keystone College

Details

Site Development, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 31 - Earthwork, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents