Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

On-Call Paving
Term Contract
Post-Bid
Norfolk, VA

Lake Taylor MS Parking Lot Resurfacing
Post-Bid
Norfolk, VA 23502

Site Repairs and Improvements
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

Virginia Beach Boulevard Improvements at Newtown Road
Results
Norfolk, VA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Miscellaneous Small Site and Roadway Projects - FY20 - Indefinite Quantity Contract
Results
Norfolk, VA 23510

Soil Densification and Pavement Lifting FY20
Results
Norfolk, VA 23510

Lake Taylor High School Bus Loop and Storm Drainage Project
Results
$465,451 est. value
Norfolk, VA

East Little Creek Road and Admiral Taussig Boulevard Intersection Improvements
Results
$603,998 est. value
Norfolk, VA 23510

Maycox Avenue Roadway Improvements
Results
Less than $409,761 est. value
Norfolk, VA 23510

Parking Lot Resurfacing Project
Results
Norfolk, VA 23510

Water Activated Cold Patch
Term Contract
Results

Statewide ADA Project Group II
Results
VA

Elizabeth River Trail Improvements at Fort Norfolk
Results
Norfolk, VA

Last Updated 04/20/2020 10:19 AM
Project Title

NTC Bus Parking Lots Repairs

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23502   (Norfolk City County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $493,305
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the removal of the existing bituminous concrete pavement in two (2) bus parking lots, and the replacement with bituminous concrete pavement and new pavement markings. Additionally, an existing drive entrance will be removed and the area reestablished with grass and landscaping. Two (2) stormwater drainage structures and one (1) reinforced concrete storm pipe is added to improve parking area drainage. A concrete dumpster pad with bollards and gated enclosed will also be added.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents