Similar Projects
Greenbrier Phase 2B
Post-Bid
Huntsville, AL 35804

Mud Valves and Stem Replacements
Post-Bid
Huntsville, AL 35804

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Swing Check Valve
Results
Less than $44,800 est. value
Huntsville, AL 35804

Miscellaneous Water Materials for the Madison County Water Department
Post-Bid
AL

Madison Boulevard Water and Sewer
Results
Madison, AL 35758

Bailey Cove Road Transmission Phase 2 Project
Post-Bid
Huntsville, AL

Western Water Transmission Main Phase 1
Results
Madison, AL 35758

Western Water Transmission Main Phase 2
Post-Bid
Madison, AL

Highland Drive Water Main
Results
Madison, AL 35758

Meter Boxes and Lids for the Madison County Water Department
Term Contract
Post-Bid
Huntsville, AL 35811

Highway 20 County Line Road to Indian Springs Road Project
Results
Huntsville, AL 35756

Swancott Road Project for Huntsville Utilities Water Department
Post-Bid
Huntsville, AL

Meter Changeout Program
Results
Huntsville, AL 35811

Bobo Section Road Water Line Replacement
Infrastructure
Post-Bid
Huntsville, AL

Reported 06/04/2021 12:00 AM
Project Title

Memorial Parkway to Mastin Lake Road Water Installation

Physical Address View project details and contacts
City, State (County) Huntsville, AL   (Madison County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The full scope of work for the project will consist of installation, pressure testing, and disinfection of approximately 2,900 linear feet of 8-inch Class 350 DIP water main, 3,700 linear feet of 12-inch Class 250 DIP water main, and 5,500 linear feet of Class 250 DIP 16-inch water main; installation of Class 250 valves, fire hydrants, and other appurtenances, installation of cross street and service connections, reconnection of existing service meters, backfill, compaction, surface restoration, removal of approximately 9,500 linear feet of cast iron mains; abandonment of existing cast iron water mains; traffic control; and erosion and sedimentation control, as required.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Fire Hydrants, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents