Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

2021 Plant Mix
Bidding
$5,219,000 est. value
VA

Center Street Improvements Project
Bidding
Herndon, VA

Reston Spectrum Right Turn Lane
Renovation
Sub-Bidding
Reston, VA 20190

Roberts Road Improvements
Results
$630,757 est. value
Fairfax, VA

Pickett Shopping Center Roadway Improvements Project
Results
$262,153 est. value
Fairfax, VA 22030

Herndon Metrorail Intermodal Access Improvements Project
New Construction
Bidding
Herndon, VA

Y--Hidden Pond Trail Resurfacing
Results
Lorton, VA 22079

Turner Fairbank Highway Research Center Project VA ST TFHRC 50(5)
Bidding
$1,000,000 to $5,000,000 est. value
Fairfax, VA

Route 28 Widening
Results
$86,748,000 est. value
VA

495 Express Lanes Northern Extension (NEXT)
New Construction
Results
VA

Subgrade Remediation and Paving Improvements for Annandale B13 North Parking Lot
Results
Annandale, VA 22003

Resurfacing Streets
Results
Less than $171,758 est. value
Fairfax, VA

2020 Latex Modified
Results
Less than $2,949,000 est. value

2020 Latex Modified
Results
Less than $2,632,000 est. value
VA

Last Updated 12/03/2020 11:59 AM
Project Title

Pavement Restoration

Physical Address View project details and contacts
City, State (County) Fairfax, VA 22031   (Fairfax County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,380,703
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes but is not limited to the following: the restoration of pavement sections, curb and gutter, sidewalk, valve boxes, curb boxes and other improvements that are generally associated with roadway infrastructure. Contractor shall furnish all labor, materials and equipment necessary to install new asphalt paving and remove off-site all excavated materials. Installation of asphalt paving shall include prime coat on stone base or tack coat on existing paving. The contractor shall provide all work necessary to insure all materials adjacent to the new construction edges shall be neat and conform to the type materials existing prior to construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents