Similar Projects
Rodney Reconstruction Phase 2 - City of Helena
Infrastructure
Conception
$1,126,284 CJ est. value
Helena, MT 59601

Rodney Reconstruction Phase 2 - City of Helena
Infrastructure
Conception
$1,126,284 CJ est. value
Helena, MT 59601

Replace Penthouse HVAC Systems
Renovation
Design
$5,000,000 CJ est. value
Fort Harrison, MT 59636

Westside Woods
New Construction, Infrastructure
Design
$65,000,000 CJ est. value
Helena, MT 59601

Lincoln Airport Access Road Paving
Infrastructure
Bidding
$350,000 CJ est. value
Lincoln, MT 59639

Lincoln Airport Access Road Paving
Infrastructure
Bidding
$350,000 CJ est. value
Lincoln, MT 59639

Lincoln Road Overlay and Chip Seal
Infrastructure
Post-Bid
$400,000 CJ est. value
Helena, MT 59601

Lincoln Road Overlay and Chip Seal
Infrastructure
Post-Bid
$400,000 CJ est. value
Helena, MT 59601

Jackson Creek Road Improvements
Term Contract
Results

Helena-Lewis & Clark 2018 Repairs, Phase 1
Term Contract
Results
Less than $5,000,000 est. value
Helena, MT

2022 Chip Seal
Infrastructure
Construction
$582,933 CJ est. value
Helena, MT 59601

2022 Chip Seal
Infrastructure
Construction
$582,933 CJ est. value
Helena, MT 59601

The Capital
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Helena, MT 59602

The Capital
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Helena, MT 59602

8th / 9th & Dakota Rehabilitation - City of Helena
Infrastructure
Conception
$600,000 CJ est. value
Helena, MT 59601

Last Updated 01/05/2024 07:32 AM
Project Title

RFQ D/B - VAMC Seismic Upgrade and Specialty Care Improvements; Phase I - Central Utility Plant (CUP) and Parking Garage (PG)

Physical Address View project details and contacts
City, State (County) Fort Harrison, MT 59636   (Lewis and Clark County)
Category(s) Heavy and Highway, Medical, Sewer and Water
Sub-Category(s) Hospital, Parking Garage, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected February 2025
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from Agency's Affiliate - 11/19/24
Owner View project details and contacts
Architect View project details and contacts
Description

General. This SOURCES SOUGHT NOTICE is for informational/market research purposes only; THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION, OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. Notice Details. The Fort Harrison Veteran's Affairs Medical Center (VAMC) in Ft Harrison, MT, has requested the U.S. Army Corps of Engineers (USACE), Northwestern Division, Omaha District (CENWO) to identify interest in Construction Services, as defined below, to support CENWO's design and construction efforts. Responses to this announcement will be used by the Government to determine the appropriate level of small business participation and to develop the acquisition strategy. The purpose of this Sources Sought notice is to update the healthcare construction industry on the project and to gain knowledge of the interest, capabilities, and qualifications of the healthcare construction industry, including small businesses and small disadvantaged businesses to include 8(a) firms, Historically Underutilized Business Zones (HUBZone), Economically Disadvantaged Women-Owned Small Business (EDWOSB) and Service-Disabled Veteran-Owned Small business (SDVOSB). All interested parties are highly encouraged to respond. Project Scope. The CENWO currently plans to execute this project in Two Phases, and the preliminary planning and design stage is underway to develop acquisition documents for the following: Phase I (Design-Build Central Utility Plant and Parking Garage): Phase I consists of a Design-Build construction contract to design and build the Central Utility Plant, approximately 2500 LF of Utilities Corridor connecting the new CUP to the hospital and other buildings on campus, a road extension, and a 660-space Parking Garage. It will also include interior demolition of the existing boiler plants and new connections in the main hospital. The construction area is north of the hospital between the hospital and the fence line with the Ft. Harrison National Guard Training Center. Central Utility Plant (CUP): The Central Utility Plant (CUP) will provide a steam and chilled water generation system for the current hospital complex and the expansion projects under Phase II, replacing the existing plant in B171. The Government estimates the CUP building will be approximately 30 ft. tall, with a floor area of roughly 15,700 ft2. It has an F-1 occupancy classification and is considered a moderate hazard per IBC 2021. It will be designed with exterior face brick to match the brick used elsewhere on campus. The CUP shall comply with VA guidelines and codes, including VA Steam, Heating Hot Water, and Outside Distribution Systems Design Manual. Utilities Corridors: The new CUP shall be connected to the hospital complex and existing steam and chilled water systems via the distribution system. The distribution system is primarily routed underground in new utility corridors (approximately at least 8'x8') and inside of the existing buildings to provide building cooling, heating, and domestic hot water needs to the following structures: Building 154 (Main Hospital and all additions), Building 141 (Administration), Building 169 (the RRTP), Future Acute Care Building (to be constructed as part of Phase II of the project), Accommodation of future Building 173 (New OP Mental Health facility - to be constructed by others). The connection from the CUP to the Main Hospital Building will be through a primary utilidor to Mechanical Room B100, located in the basement of Building 154. Utility piping from the primary utilidor will reach the final equipment connections using secondary utilidors from the primary. The Designer of Record (DoR), with the approval of the Government, may use the Main Hospital basement crawlspace to make connections to other facilities instead of secondary utilidors. In addition to steam, steam condensate, and chilled water piping, the utilidors must have lighting, ventilation, fire protection, and drainage per code and VA requirements. The design of the utilidor must ensure a safe working environment, meeting all requirements. Parking Garage: The parking garage is an approximately 660-space parking structure. The project includes site improvements, rerouting of existing streets, site utilities, and a covered walkway. The facility will also include facility vertical transportation, facility mechanical, electrical, communications, and fire protections systems. The facility shall meet life safety, physical security, and accessibility requirements. The new parking garage will have optional covered parking and serve as the primary drop off location for the VA medical center, building 154. An attached covered walkway will connect the garage to the entry of building 154. The facility will have vertical transportation lobbies at each level. The exterior wall construction will consist of ornamental brick over concrete parking structural frame and vehicle barriers. The parking structure will not include any conditioned space. CENWO intends to issue the Phase One solicitation for the Design-Build Construction Services (of a Two-Phase Design-Build Acquisition IAW FAR Part 36) sometime in late January 2024 for an award in July 2024. Phase one proposals will be due late February 2024. Solicitation number is W9128F23R0042. Phase II (New Acute Care Building, Hospital Seismic Upgrade, Hospital Renovation, and Site Improvements): Phase II consists of a construction contract (or contracts) to construct a three-story, 82,585 GSF Acute Care Building addition to the existing hospital on the south side, upgrade the existing hospital building to meet current seismic requirements, renovate most (approximately 185,000 GSF) of the existing hospital complex to accommodate a better Veteran Experience, upgrade the administration building to correct seismic and access deficiencies (approximately 37,000 GSF), and to correct physical security deficiencies throughout the campus. The Government is considering various delivery methods for Phase II, including Design-Build, Design-Bid-Build, and Integrated Design and Construction. New Acute Care Building (ACB) Addition: The new 82,585 GSF addition will consist of three stories with a partial basement, like the existing tower on campus. The new facility will house a new Surgery unit, Post-Anesthesia Care Unit (PACU), Intensive Care Unit (ICU), Med/Surg Inpatient Unit, Sterile Processing, and other support functions. The new ACB will serve as necessary swing space for the hospital's seismic upgrade and renovation. Hospital (154+) Seismic Upgrade: Upgrades mainly involve reinforcing steel and shotcrete to vertical elements such as stairs, elevators, and several exterior walls. Hospital (154+) Renovation: Renovate approximately 185,000 GSF of the existing hospital complex to house the Sleep lab, Education, Prep/recovery, Endocrinology, Pain Management, Lab, Logistics, Nutrition, Support, Emergency Department, Pharmacy, Imaging, Primary Care, Dental, Storage, IT, Engineering, Rehabilitation, and other services. The intent of the renovation is to: Create a new central public entry oriented toward the new parking garage, with a covered connector for the safety and comfort of veterans and visitors. Simplify the overall corridor system for more intuitive wayfinding for veterans and visitors. Place the new elevator core along an easy-to-discern axis aligned with the new public entry and existing elevator core and incorporate access from the recently added outpatient entry at Building 150. Ensure back-of-house connections for patient transport between Emergency, Imaging, Med/Surg Unit, and Surgery that avoid conflict with public corridors and elevators. Move the Emergency Department to a location that provides dedicated walk-in and ambulance entries, separate from and ideally not visible from the main public entry. Incorporate remote MRI into the Imaging Department and relocate the mobile imaging dock (PET Scanner) from the east basement level to the west 1st Floor level for shorter, safer patient transport distances. Reallocate delivery patterns between west 1st Floor dock and the east basement level dock to avoid transporting supplies and waste through public areas on the 1st Floor. Reconfigure 2nd Floor corridor toward westernmost service elevator to correct thru-traffic at Lab. Relocate Biomedical Engineering from the existing basement location to reestablish continuous service pathway in the area. Provide basement-level connection between existing facility and new elevator core for back-of-house service circulation. Extend the existing main service elevator to serve the basement level of the existing facility for better back-of-house service circulation. Replace existing MEP systems. Update facade and buildings to comply with VA PSRDM. Administrative Building (141) Seismic Upgrade and Renovation: Structural Seismic Upgrades mainly involve installation of diaphragm ties in floor slabs at each level. Installation of each element will require access to the slab from both top and bottom sides simultaneously. Minor renovations to the building will provide for better access, ADA compliance, and physical security updates. Upgrades to the MEP system to comply with sustainability goals and to take advantage of the new CUP. Campus Physical Security Upgrades: Updates to the entry control point, electrical distribution system, campus lighting, updates to the existing perimeter fencing, and other upgrades to the campus to meet the requirements of the PSRDM. Communications with Industry. CENWO is organizing a virtual discussion and teleconference for interested parties to attend on 31 January 2024 at 1:00 PM CST to provide additional project information and address any industry questions. All information discussed during this virtual industry day may change as further project details become available. To obtain the teleconference details and any accompanying materials, interested parties should contact Adam Beaver, Contract Specialist, at adam.l.beaver@usace.army.mil no later than 19 January 2024 at 4:00PM CST. The e-mail must include: SUBJECT: "Sources Sought W9128F24SC005 - Ft Harrison, MT VAMC Seismic Upgrade and Specialty Care Improvements - Industry Day Teleconference Info Request" CONTENT: Firm name and CAGE code, in person or teleconference, names of parties attending, anticipated number attendees, and any questions, recommendations, or concerns the firm has which may influence the acquisition strategy. Submission Instructions. Submit formal responses to this Sources Sought notice electronically (via e-mail) with SUBJECT: Sources Sought W9128F24SC005 - Ft Harrison, MT VAMC Seismic Upgrade and Specialty Care Improvements. Please e-mail your response to adam.l.beaver@usace.army.mil no later than 09 February 2024 at 4:00 PM CST. Responses to this Sources Sought Notice shall be limited to fifteen (15) pages and include the following information: Firm's name, address, point of contact, phone number, e-mail address, CAGE and DUNS number. Firm's business category and size: Large Business (include summary of small business participation metrics), Small Business, Small Disadvantaged, 8(a) firm, Historically Underutilized Business Zones (HUBZone), Economically Disadvantaged Women-Owned Small Business (EDWOSB), and Service-Disabled Veteran-Owned Small business (SDVOSB). Provide a maximum of four project examples, similar in size, scope, and complexity to the work described in paragraphs 3 of this notice, with a brief description of each project, customer name, timeliness of performance, contract number, customer satisfaction, and the final project dollar value. The project examples should adequately demonstrate that the firm possesses similar experience related to the project details contained within this notice. Additionally, within the content limitations above, please address the extent of small business participation in the project examples provided. Disclaimer and Important Notes. This notice does not obligate the Government to award a contract. The Government shall not reimburse expenses incurred while responding to this Sources Sought Notice or any follow-up requests. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure its response is complete and sufficiently detailed to allow the Government to determine the organization's interest and capabilities to perform the work. The Government is not obligated to acknowledge receipt of information or provide feedback. All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov and remain current for the duration of the source selection process to be eligible for award of a government contract. The method of contractor selection has not been determined at this time. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Parking Spaces, 660 Parking Spaces. 15,700 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents