Similar Projects
Pearl Place
New Construction, Infrastructure - 43,000 SF
Conception
$3,100,000 CJ est. value
Santa Rosa Beach, FL 32459

Pearl Place
New Construction, Infrastructure - 43,000 SF
Conception
$3,100,000 CJ est. value
Santa Rosa Beach, FL 32459

Bishop Landing
New Construction, Infrastructure
Design
$79,800,000 CJ est. value
Santa Rosa Beach, FL 32459

Bishop Landing
New Construction, Infrastructure
Design
$79,800,000 CJ est. value
Santa Rosa Beach, FL 32459

Water, Sewer And Roadway At Woodlawn Commerce Park
Infrastructure
Post-Bid
Defuniak Springs, FL

South Jackson Street SCOP Improvements
Infrastructure
Post-Bid
Freeport, FL 32439

Shoulder Work
Infrastructure
Results
$750,000 est. value
FL

Shoulder Work
Infrastructure
Results
$600,000 est. value

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Dollar General / DeFuniak Springs
New Construction, Infrastructure - 12,480 SF
Pending Verification
$3,000,000 CJ est. value
Defuniak Springs, FL 32433

The Southern Phase 2
New Construction, Infrastructure
Pending Verification
$40,700,000 CJ est. value
Santa Rosa Beach, FL 32459

Retreat at the Bay
New Construction, Infrastructure - 17,600 SF
Conception
$51,400,000 CJ est. value
Santa Rosa Beach, FL 32459

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Hewett Bayou Connector Road - Walton County
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Defuniak Springs, FL 32435

Milling and Resurfacing of SR 30 (Us 98) From East of Village Road (Mp 4.526) To East of SR 83 (Us 331) (Mp 13.203) In Walton County. Mp 5.531 To Mp 7.606
Infrastructure
Results
FL

Last Updated 04/07/2023 12:03 PM
Project Title

TownePlace Suites / Miramar Beach

Physical Address View project details and contacts
City, State (County) Miramar Beach, FL 32550   (Walton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a demolition of an existing hotel for a new TownePlace Suites. As of April 6, 2023, this project this project has been approved by Walton County TRC. Information regarding a general contractor has not been disclosed. A firm timeline for construction has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents