Similar Projects
Abbe Road North Refrigerated Warehouse
New Construction, Infrastructure - 150,000 SF
Conception
$24,340,000 CJ est. value
Sheffield Lake, OH 44054

Abbe Road North Refrigerated Warehouse
New Construction, Infrastructure - 150,000 SF
Conception
$24,340,000 CJ est. value
Sheffield Lake, OH 44054

Grande Esplanade
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
North Ridgeville, OH 44039

Roadway Minor Rehab
Infrastructure
Design
$1,487,000 CJ est. value
Elyria, OH 44035

2023 Main Street Middle Road Resurfacing
Infrastructure
Bidding
$437,020 CJ est. value
Avon, OH 44011

2023 Main Street Middle Road Resurfacing
Infrastructure
Bidding
$437,020 CJ est. value
Avon, OH 44011

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Design - New Fire Station Facility
New Construction, Infrastructure - 12,000 SF
Post-Bid
$3,000,000 CJ est. value
Grafton, OH 44044

Paving Various Columbia Township Roads
Results
Columbia Station, OH

Linda Drive Reconstruction Phase 2
Infrastructure
Results
$189,900 est. value
Lorain, OH 44053

Noveon/Lubrizol Building Addition
Addition, Demolition, Infrastructure - 1,856 SF
Pending Verification
$1,000,000 CJ est. value
Avon Lake, OH 44012

Detroit Road Mixed Use
New Construction, Infrastructure - 11,300 SF
Pending Verification
$3,000,000 CJ est. value
Avon, OH 44011

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

Four Lane Resurfacing - US 20
Infrastructure
Bidding
$3,890,597 CJ est. value
North Ridgeville, OH 44035

Four Lane Resurfacing - SR 10-00.00
Infrastructure
Post-Bid
OH

Last Updated 01/27/2023 12:35 AM
Project Title

Roadway Minor Rehab

Physical Address View project details and contacts
City, State (County) Lorain, OH 44052   (Lorain County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2024
Bids Due View project details and contacts
Estimated Value $3,663,370 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing - Urban Paving City of LorainLOR-611-00.00(Begin at US 0006) to 05.57(E. Lorain Corp. Limit)LOR-611D-0.00 to 0.44 As of January 27, 2023, the project is in Design status. Anticipated letting date is May 09, 2024. OHDOT - SR 611 Roadway Minor Rehab *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents