Similar Projects
2021 Museum HVAC Replacement
Alteration
Bidding
Louisville, CO

Domestic Water and Heating Pipe Insulation
Post-Bid
Boulder, CO 80303

Air Conditioning - Design Build
Post-Bid
Boulder, Louisville, CO

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Notice 20-01-Rfp-Umc-Bldg-Recommissioning
Results
Less than $800,000 est. value
Boulder, CO

Sources Sought - Cryogenic Dilution Refrigerator System
Post-Bid
Boulder, CO

Saint Vrain HUB - AHU Replacement
Results
Longmont, CO 80501

Nist Boulder Building 42 Cooling Tower Capacity Upgrade
Post-Bid
$1,000,000 to $5,000,000 est. value
Boulder, CO 80305

Replace Windows, Stairs and HVAC at Longmont Readiness Center
Results
Less than $350,000 est. value
Longmont, CO 80501

Purchase and Delivery of Roof Top Unit (RTU) - Lyons High School
Post-Bid
Lyons, CO 80540

NIST Building 42 Central Utility Plant - Cooling Tower Upgrade
Results
$1,000,000 to $5,000,000 est. value
Boulder, CO 80305

CP291773 - Camp - CHW Plant Enhancement Project
Post-Bid
Less than $5,000,000 est. value
Boulder, CO 80303

Chiller Replacement
Results
Longmont, CO 80503

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Heat Exchanger Tube Bundles
Results

Reported 08/20/2021 12:00 AM
Project Title

Nextlight HVAC System

Physical Address View project details and contacts
City, State (County) Longmont, CO   (Boulder County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Due to a growing network and subscriber base, Nextlight is required to replace the current HVAC solution at one site. This will require the removal of the current cooling solution, and the installation and procurement of a properly sized, ducted, and configured HVAC system. The dimensions and layout of the space does not lend itself to a typical installation, but instead will require a highly customized solution. During, or immediately after, the installation of the new HVAC units the drop ceiling will need to be repaired and upgraded to allow for proper separation of the plenum and room spaces.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents