Similar Projects
Street Reconstruction - Pierce/Curtis Intersection - MCW-CP24-010 - City of Laramie
Infrastructure
Conception
$485,000 CJ est. value
Laramie, WY 82070

Street Reconstruction - Pierce/Curtis Intersection - MCW-CP24-010 - City of Laramie
Infrastructure
Conception
$485,000 CJ est. value
Laramie, WY 82070

New Restroom Facility
New Construction, Infrastructure
Design
$300,000 CJ est. value
Laramie, WY 82070

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

North Wilson Area Snow Removal Project (7-21-M)
Term Contract, Infrastructure
Results

District 1 Crack Seal
Infrastructure
Results

Street Rehabilitation - Joanna Bruner - MCW-CP24-011 - City of Laramie
Infrastructure
Conception
$780,000 CJ est. value
Laramie, WY 82072

University of Wyoming Halls and Dining - Subcontractors and Suppliers
New Construction, Infrastructure, Renovation
Post-Bid
$170,000,000 CJ est. value
Laramie, WY 82070

Grading, Milling Plant Mix, Placing Crushed Base and Bituminous Pavement Surfacing (Recycle), Chip Seal and Miscellaneous
Infrastructure
Results
WY

Boswell Drive Reconstruction - City of Laramie
Infrastructure
Conception
$1,150,000 CJ est. value
Laramie, WY 82070

Street Networking Equipment
Infrastructure
Post-Bid
$100,000 CJ est. value
Laramie, WY 82070

Chip Sealing
Infrastructure
Results

Labonte Park Pond - City of Laramie
Infrastructure
Conception
$430,000 CJ est. value
Laramie, WY 82072

Laramie Streets (3rd St. and Flint St.)
Infrastructure
Results
$200,000 est. value
Laramie, WY 82072

Last Updated 08/05/2022 07:05 AM
Project Title

Palmer Street Reconstruction - SPS-CP23-004 - City of Laramie

Physical Address View project details and contacts
City, State (County) Laramie, WY 82070   (Albany County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2026
Bids Due View project details and contacts
Estimated Value $875,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project construction will be phased over two years and will include a full depth reconstruction of 6"asphalt and a 9" base with geo grid and fabric. Phase 1 ($875,000 FY26) is 9th to 13th street and phase 2 ($875,000 FY27) will be from 13th to 17th street to be coordinated with water project. This project incudes spot repairs to curb, gutter, sidewalk and ADA upgrades. This project is in included in the City's or County's FY 2022-2026 Capital Improvement Plan (CIP). As of August 05, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents