Similar Projects
Country Club Expansion
Renovation
Conception
Glenview, IL 60025

Maine South HS Synthetic Turf Replacement
Post-Bid
Park Ridge, IL 60068

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Site Paving
Post-Bid
Elgin, IL 60120

Sidewalk, Curb
Results
Hanover Park, IL

Removal and Replacement Existing Damage Sidewalk, Curb and Gutter
Post-Bid
Bartlett, IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

East Eighth Street Reconstruction
Post-Bid
Hinsdale, IL

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

Last Updated 08/16/2022 11:07 AM
Project Title

Cedar Lane Roadway Improvements

Physical Address View project details and contacts
City, State (County) Northbrook, IL 60062   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $225,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City: Northbrook County: Illinois State/Province: IL Site Directions: Cedar Lane from Cherry Lane south to Village Hall access in the Village of Northbrook, Cook County. Project Category Code: ADA Curb Ramps, Safety Improvements, Pavement - Marking, Construction, Sidewalks/Curbs/Gutters, Aggregate, Street/Road Asphalt Resurfacing and Milling, Sawcutting/Sidewalk/Pavement, Pavement Removal, Excavation, Walkway/Passage/Corridor, Paving (Asphalt or Concrete), Street/Road Intersection Improvements, Roadway Pavement Markings, Street/Road Intersection Construction and Repair, Street/Road Lane Construction and Repair, Pedestrian Improvements, Street/Roadway Reconstruction , Street/Road Pavement Marking, Street/Road Repairs, Curbs, Signage Description: Construction of approximately 1,890 square yards of partial depth patching and 362 square yards of Class D patching on Cedar Lane and the intersection of Cherry Lane and Cedar Lane in the Village of Northbrook, Illinois.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents