Similar Projects
Fire Station 5
New Construction
Design
Orange Beach, AL 36561

Fire Station No. 5 Bay Relocation
Renovation - 2,400 SF
Bidding
Orange Beach, AL 36561

New Facility For The Tuscaloosa County Sheriffs Department - PEMB Trade Package
Renovation
Bidding
Tuscaloosa, AL 35401

Wicksburg Volunteer Fire Department
- 7,748 SF
Post-Bid
Newton, AL 36352

Ashford Fire Station
Post-Bid
Ashford, AL 36312

Fire Station #5
New Construction
Results
Less than $1,615,000 est. value
Daphne, AL 36526

Hoover Fire Station No 05 Renovation
Renovation
Results
Hoover, AL 35226

Public Safety Training Facility
New Construction - 35,000 SF
Construction
Less than $6,500,000 est. value
Huntsville, AL 35805

Fire Station #4 and Police Annex
Construction
Prattville, AL 36067

Ono Island Fire Station No. 4
Post-Bid
Orange Beach, AL 36561

A New Fire Station
New Construction
Results
Priceville, AL 35603

Alabaster Police Department Building Package
New Construction - 32,000 SF
Construction
Less than $11,772,000 est. value
Alabaster, AL 35007

Fire-Rescue Department Training Center
New Construction
Post-Bid
Mobile, AL 36604

Pelham Range Fire and Emergency Services Building Construction
New Construction
Results
Less than $1,400,000 est. value
Anniston, AL

Auburn Fire Station 6
New Construction
Construction
$2,900,000 to $3,400,000 est. value
Auburn, AL 36830

Last Updated 08/09/2021 06:51 PM
Project Title

New Fire Station No. 7

Physical Address View project details and contacts
City, State (County) Gadsden, AL   (Etowah County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,693,184
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work includes, but is not limited to, construction of a new load-bearing exterior masonry wall structure consisting of, face brick masonry veneer, EIFS, light-gauge metal roof trusses, composition shingle roofing, pre-finished metal gutters, fascia and downspouts, sectional overhead doors, aluminum storefront entrances and windows, site improvements and utilities. The new facility will house two Apparatus Bays, FEMA Storm Shelter, Restroom and Shower Areas, Kitchen, Dayroom/Dining Room, Bunk Rooms, Laundry/Decontamination Room, Office and Mechanical/Electrical Room. Interior construction will primarily be metal stud framing, gyp. board, exposed painted CMU, lay-in ceilings, LVT and porcelain tile flooring and casework cabinetry. Electrical work will consist of IT cabling, power and suspended and lay-in LED fixtures. HVAC systems will include gas-fired infrared heaters, fresh air ventilation and package unit HVAC with gas-fired heat and electric cooling.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents