Similar Projects
Remove and Replace Small A/C Units at Cape Fear High School
Alteration
Bidding
Fayetteville, NC 28312

Montclair Elementary School Package AC and Office A/C Replacements
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28314

College Lakes Elementary Kitchen A/C
Post-Bid
Fayetteville, NC 28311

Hope Mills Middle Auditorium Compressor Replacement
Post-Bid
Hope Mills, NC 28348

Westover High School HVAC Infrastructure Phase II
Results
Fayetteville, NC 28303

Job Order Contract for HVAC Installation and Repair
Term Contract
Results
Fayetteville, NC 28302

William H. Owen office A/C Unit replacement
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28304

Crown Coliseum Cooling Tower Replacement
Post-Bid
Fayetteville, NC 28302

Hope Mills Middle Locker Room HVAC Addition
Results
Less than $17,333 est. value
Hope Mills, NC 28348

Brentwood Elementary School Package AC Replacements for Buildings 2,3,4 and 5
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28304

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Pine Forest Middle School Building 3 HVAC Renovation
Results
Fayetteville, NC 28311

Remove and Replace One Existing 2.5 Ton Package Unit and One 5 Ton Package Unit at Ponderosa Elementary School
Alteration
Bidding
$2,000 to $30,000 est. value
Fayetteville, NC 28303

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

South View Middle School Classroom Area HVAC Upgrade
Results
Hope Mills, NC 28348

Last Updated 07/27/2021 04:22 PM
Project Title

Armstrong Gym A/C Replacements

Physical Address View project details and contacts
City, State (County) Eastover, NC 28312   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove and dispose of the three existing 5 ton package units. The contractor shall install three new 5 ton package heat pumps with thermostats. The contractor shall supply new disconnects with new conduit and power wire from the new disconnect to the new unit. All duct work shall be sealed with mastic. The duct shall be wrapped and covered with a metal shroud. All work will be done by code. The contractor shall be responsible for all permits and fees.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents