Similar Projects
Replace Roof/ Camp Williams
Alteration
Conception
$568,800 est. value
New Lisbon, WI

Roof Replacement Gordon Correctional Center Department of Corrections
Renovation
Bidding
$262,000 CJ est. value
Gordon, WI 54838

Roof Replacement - Eau Claire Armory
Renovation
Sub-Bidding
$684,200 CJ est. value
Eau Claire, WI 54703

Roof Replacement at University of Wisconsin
Renovation
Sub-Bidding
$1,032,000 CJ est. value
Stevens Point, WI 54481

Senior Center
Alteration
Post-Bid
Jefferson, WI 53549

2022 Utility Roofing
Alteration
Post-Bid
Stevens Point, WI 54481

Roof Replacement
Alteration
Results
Prairie Farm, WI 54762

City Hall Roof Replacement
Alteration
Results
Rice Lake, WI 54868

Interpretative Center Roof Replacement Havenwoods State Forest
Renovation
Construction
$328,400 CJ est. value
Milwaukee, WI 53209

Roof Replacement MEP
Renovation
Construction
$1,245,332 CJ est. value
Madison, WI 53706

Glenwood Children Park Arch Repair
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Madison, WI 53711

Highway Department Roof Replacement
Alteration
Post-Bid
Menomonie, WI 54751

Neeskara Elementary School - Roof Replacement
Alteration
Results
Milwaukee, WI 53208

Gym Roof Replacement
Renovation
Construction
$180,474 CJ est. value
Prairie du Chien, WI 53821

Beaver Creek Reserve Ceiling Insulation
Renovation
Sub-Bidding
$248,840 CJ est. value
Fall Creek, WI 54742

Last Updated 07/12/2023 10:15 AM
Project Title

Adams County Courthouse Roof Replacement

Physical Address View project details and contacts
City, State (County) Friendship, WI 53934   (Adams County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $425,170 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of approximately 29,500 SF of roof replacement. The existing roofing systems including edge metal to be removed consists of both 1.) fully adhered EPDM membrane and tapered insulation on metal deck and 2.) loose laid ballasted EPDM membrane and tapered insulation on a concrete deck. The new roofing systems including edge metal to be installed consists of new fully adhered EPDM membrane and tapered insulation. No proposal will be accepted unless accompanied by a bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Al Szymanski, 1230 South Blvd, Baraboo, WI 53913. The bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the bid bond shall be forfeited to the OWNER as liquidated damages. Performance and Payment Bonds for the full contract amount shall be required from the successful Bidder. Prequalification of bidders will not be required. Bidders to whom award of a Contract is under consideration shall submit to Architect, upon request, a properly executed AIA Document A305 Contractor's Qualifications Statement. No bidder may withdraw his bid within 15 days after the actual date of the opening thereof. Owner reserves the right to reject any or all bids, waive or not waive any informalities in the bids received, and to accept any proposal which they deem most favorable to the interests of the Owner.

Details

29,500 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents