Similar Projects
Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

2021 LRIP Road Improvements
Post-Bid
New Auburn, WI 54757

ATV / UTV Trail Construction
New Construction
Results
Lake Wissota, WI 54729

Lift to Road
Infrastructure
Post-Bid
Bloomer, WI

Durand - Eau Claire, Rock Creek Bridge, B-17-0226
Results
Durand, Eau Claire, WI 54736

Culvert Installation
Infrastructure
Post-Bid
WI 54724

Glenwood City - Colfax, STH 128 to STH 79, Glenwood City - Colfax, STH 25 to CTH D, Glenwood City - Colfax, STH 79 to STH 25
Results
Colfax, Glenwood City, WI 54013

Road Work
Infrastructure
Post-Bid
Bloomer, WI 54724

Anson 105th Avenue Resurfacing
Results
Jim Falls, WI

Crack Sealing
Infrastructure
Post-Bid
Bloomer, WI 54724

C. Chippewa Falls, Seymour Cray SR Blvd., CTH I Intersection
Results
Chippewa Falls, Seymour, WI

2021 Road Improvements
Infrastructure
Post-Bid
Sand Creek, WI

Last Updated 11/12/2021 11:11 PM
Project Title

Connorsville - Bloomer, Culvert C-17-0047

Physical Address View project details and contacts
City, State (County) Bloomer, Connorsville, WI (Chippewa, Dunn Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, Borrow, Base Aggregate Dense, Backfill Structure, Concrete Masonry Culverts, HS Bar Steel Reinforcement, HS Bar Steel Reinforcement Coated, Pavement Marking, Construction Staking, Asphaltic Surface, Concrete Barrier Temporary Precast, Crash Cushions Temporary, Traffic Control, and Temporary Shoring. Excavation Common, 495 CY; Borrow, 612 CY; Backfill Structure, 1,286 Ton; Base Aggregate Dense, 620 Ton; Breaker Run, 83 Ton; Concrete Masonry Culverts, 114 CY; Bar Steel Reinforcement, 22,260 Lbs; Bar Steel Reinforcement Coated, 1,570 Lbs; Marking Tape, 1,602 LF; Marking Epoxy, 1,477 LF; Construction Staking, 514 LF; Construction Staking, 2 LS; Asphaltic Surface, 106 Ton; Tack Coat, 21 Gals; Concrete Barrier Temporary Precast Delivered, 260 LF; Crash Cushions Temporary, 3 Each; Temporary Traffic Signals for Bridges, 1 LS; Temporary Stream Diversion Culvert, 1 Each; Temporary Shoring, 1,100 SF; Riprap Heavy, 48 CY.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents