Similar Projects
Reported | 09/23/2021 12:00 AM |
Project Title | Canyon Street And Utah Ave. Road Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Hildale, UT (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Approximately 3,500 feet of new bike lane, curb, gutter, and sidewalk, including driveway aprons, pedestrian ramps, and light grading, and a school crossing with raised crosswalk. Some portions of the project will require tie-ins to existing curbing and/or sidewalk. The contractor will be responsible for preparing subgrade between existing edge of pavement and the new proposed curb and gutter. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |