Similar Projects
New Hickory Campus Building Renovation
Renovation - 225,800 SF
Conception
Hickory, NC 28601

New Vocational Center
New Construction
Conception
Hickory, NC

NCCU Collaborative Research and Learning Center
New Construction - 5,000 SF
Design
$3,000,000 est. value
Durham, NC

Main, Powell and Gee Buildings Renovations
Renovation - 42,500 SF
Design
$42,000,000 est. value
Graham, NC 27253

RFP Construction Manager at Risk - Fayetteville State University - College of Education
Demolition, New Construction, Infrastructure - 110,000 SF
Bidding
$63,000,000 CJ est. value
East Fayetteville, NC 28301

RFQ D/B - Auditorium Renovation in the Educational Technology Center (ETC)
Renovation
Bidding
$2,500,000 CJ est. value
Durham, NC 27705

North Carolina School of Science and Mathematics Site Development
Post-Bid
Morganton, NC 28655

UNCSA - New Residence Hall
New Construction - 129,999 SF
Post-Bid
Less than $46,000,000 est. value
Winston-Salem, NC 27127

Design Build for New Early College/Career Technical/Alternative Program Building
Results
Murphy, NC 28906

Western Union County Center for Entrepreneurship
New Construction - 17,000 SF
Results
Less than $6,200,000 est. value
Polkton, NC 28135

NCCU - New School of Business
New Construction - 75,000 SF
Construction
$30,000,000 est. value
Durham, NC 27701

Lyons Science Center Comprehensive Renovation
Renovation
Construction
Fayetteville, NC 28301

Montreat College Mcleod Hall
Renovation - 3,715 SF
Pending Verification
Montreat, NC 28757

Thales Academy
New Construction
Pending Verification
New Bern, NC

Taylor Theatre Infrastructure Renovation
Renovation
Conception
Greensboro, NC

Last Updated 09/29/2022 10:33 AM
Project Title

Jack Hunt Cooling Tower

Physical Address View project details and contacts
City, State (County) Shelby, NC 28152   (Cleveland County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Construction start expected November 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 6, 2022. The Project has been canceled. There is no definite date for the rebid.** 1. Provide and install new Evapco cooling tower model # ESD-102-45J or Equivalent. 2. Provide all piping connections and insulation required for installation. 3. Provide electrical all connections. 4. Protect all grounds and grass in this area, this is near front door of college. 5. Provide all control wiring to tie in Build Automation System for cooling tower. Note : Manufacturer's name and model/catalog numbers used are for the purpose of identification and to establish quality level desired. Such references are not intended to be restrictive and comparable products of other manufacturer will be considered. However, Vendors are cautioned that all equipment items must be both quality and functionally equivalent to the equipment listed in the "Scope of Work". All wiring all plumbing all electrical related to this work is required. The vendor is responsible for keeping all rooms protected from damage from dust, water etc. All new equipment is to tie into existing BMS. The vendor responsible for all dump fee's and dumpster costs. Mandatory site visit to bid any or all work. Once the sign-in process is complete, all other persons wishing to attend may do so to the extent that space and circumstances allow. The purpose of this visit is for all prospective Vendors to apprise themselves with the conditions and requirements which will affect the performance of the work called for by this Invitation for Bid. Vendors shall stay for the duration of the site visit. No allowances will be made for unreported conditions that a prudent Vendor would recognize as affecting the work called for or implied by this bid. Vendors are cautioned that any information released to attendees during the site visit, other than that involving the physical aspects of the facility referenced above, and which conflicts with, supersedes, or adds to requirements in this Invitation for Bid, must be confirmed by written addendum before it can be considered to be a part of this bid. QUESTIONS All questions from bidders must be received by no later than 2:00 PM EST, on Friday, April 8th, 2022. The questions shall be emailed to ashleyl@clevelandcc.edu. The subject line should read "Questions 89-20220330D". All questions will be answered as soon as possible by the college and posted as an addendum to this solicitation. Contractors are hereby notified that they must have proper license under the State laws governing their respective trades and that North Carolina General Statute 87 will be observed in receiving and awarding contracts. No bid may be withdrawn after the opening of bids for a period of 30 days. The Owner reserves the right to reject any or all bids and waive informalities. Bids shall be made only on the BID/ACEPTANCE form provided herein with all blank spaces for bids properly filled in and all signatures properly executed. Along with the BID/ACCEPTANCE FORM and itemized sheet listing the make, model and general specifications for each piece of equipment to be used to satisfy the "scope of work" of this solicitation document must be included. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. Please note on the envelope - Bid 89-20220330A: Attn: Lance Ashley HVAC Replacement Student Activities Center 04/20/2022 (Contractor) (License Number

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents