Similar Projects
5-Acre Neighborhood Park - CP0565 - City of Visalia
Infrastructure
Conception
$2,000,000 CJ est. value
Visalia, CA 93291

Design Tower St (Rd 148) from Walnut Ave to Visalia Parkway (1.6 miles) - CP0526 (3010) - City of Visalia
Infrastructure
Conception
$567,500 CJ est. value
Visalia, CA 93292

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Rehabilitate Ash Mountain & Buckeye Wastewater Treatment Plants
Infrastructure
Bidding
$10,000,000 CJ est. value
Visalia, CA 93291

Porterville Animal Shelter Facility Improvements
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Porterville, CA 93257

Street Light Poles And Accessories
Term Contract
Post-Bid
Visalia, CA

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Post-Bid
Fresno, Sequoia National Park, CA

FY 21/22 Reclamite Project (Measure N)
Infrastructure
Results
$1,300,000 est. value
Visalia, CA 93291

FY 21-22 Crack Seal Project
Infrastructure
Results
$400,000 est. value
Visalia, CA

St. George Spine and Pain Surgery Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 14,065 SF
Pending Verification
$1,000,000 CJ est. value
Visalia, CA 93277

Country Club Plaza Shopping Center
New Construction, Infrastructure - 74,025 SF
Pending Verification
$19,500,000 CJ est. value
Visalia, CA 93291

Laura Avenue Widening at Garden Street - NEW - City of Visalia
Infrastructure
Conception
$273,000 CJ est. value
Visalia, CA 93277

Water Main Replacement Project - Lafayette Avenue and Sycamore Avenue
Infrastructure
Bidding
$280,000 CJ est. value
Lindsay, CA 93247

Cape Seal Project (FY21/22)
Infrastructure
Post-Bid
$1,000,000 est. value
Visalia, CA 93291

Grading Peoples Basin
Infrastructure
Results
Woodlake, CA 93286

Last Updated 08/02/2022 02:03 AM
Project Title

Riggin Widening Shirk to Akers - NEW (3010) - City of Visalia

Physical Address View project details and contacts
City, State (County) Visalia, CA 93292   (Tulare County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes curb and gutter,pavement, medians, street lights, and other infrastructure such as fire hydrants, drainage inlets and utility relocation.This segment, along with other CIP's to widen Riggin will help to complete the 4-lane arterial from Hwy 63 to Hwy 99 on Riggin Ave, providing a major East-West corridor along the North side of Visalia. Multi-funded project total of $10.5m from $1.6m Measure R Regional (133) and $8.9m Transportation Impact (241). This project is in included in the City of Visalia FY 2022/23 & 2023/24 Capital Improvement Plan (CIP). As of August 1,2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents